合作
艺术
美容与健康
工艺
文化与历史
娱乐
环境
食品与饮料
逆向工程
科学
体育
技术
可穿戴设备
Bismuth: Sweated Out of Native Ore in Inclined Iron Tubes, the Schneeberg Way (Thorpe, 1912)
Charlie

创建者

Charlie

4. 十一月 2026DE
3
0
0
0
0

Bismuth: Sweated Out of Native Ore in Inclined Iron Tubes, the Schneeberg Way (Thorpe, 1912)

The old way of getting bismuth from ore that holds it as the metal: heat the lumps just enough in sloping iron tubes and the bismuth, which melts easily, runs out of the rock into pots under charcoal. It takes 30-60 minutes a charge but gets only about two-thirds of the metal. Not given: the furnace temperature. Source: E. Thorpe, Dictionary of Applied Chemistry vol. I (1912), Bismuth, p. 458. Picture: Thorpe's Fig. 1, the furnace in plan.
中级
30-60 minutes per charge

说明

1

Pick and break the ore

Sort the ore (7-12 % bismuth) by hand from the waste rock as far as possible and break it into pieces the size of a hazel nut.

此步骤所需材料:

自然铋矿石自然铋矿石1 12 cwt per tube charge

所需工具:

锤子锤子
工业平台秤工业平台秤
2

Charge the tubes

Load about 12 cwt into each inclined iron tube of the furnace, leaving room to stir from the upper end. Close the upper ends with iron plates and the lower ends with plates pierced with round holes. Under each lower end stand an iron pot holding powdered charcoal, kept gently warm by a small charcoal fire.

此步骤所需材料:

木炭木炭1 powdered, in the pots and for the pot fire

所需工具:

铋熔析炉铋熔析炉
铸铁坩埚铸铁坩埚
3

Sweat out the bismuth

Fire the furnace with wood so that the metal flows easily. In about 10 minutes the bismuth begins to run into the pots, where the charcoal covers it from the air. Stir the ore now and then with an iron rod from the upper end; in 30-60 minutes the charge is done. 20 cwt of ore burns about 63 cubic feet of wood.

此步骤所需材料:

薪柴薪柴1 about 63 cu ft per 20 cwt of ore

所需工具:

铋熔析炉铋熔析炉
铁棒铁棒
4

Rake out and recharge

Rake the spent ore (bismuth barley) out of the upper end into the tank and refill at once with fresh ore.

所需工具:

铁耙铁耙
铋熔析炉铋熔析炉
5

Cast ingots

Ladle the bismuth from the pots into moulds and cast ingots of 25-50 lb.

所需工具:

铸铁坩埚铸铁坩埚
铸造浇包铸造浇包
锭模锭模

材料

3
  • 1 12 cwt per tube charge
    占位符
  • 1 powdered, in the pots and for the pot fire
    占位符
  • 1 about 63 cu ft per 20 cwt of ore
    占位符

所需工具

8

此蓝图制作

CC0 公共领域

此蓝图以 CC0 协议发布。你可以自由复制、修改、分发和使用此作品,无需征得许可。

通过购买蓝图中的产品支持创客,他们将获得 创客佣金 (由供应商设定),或创建此蓝图的新版本并将其作为连接包含在你自己的蓝图中以分享收入。

讨论

(0)

登录 加入讨论

加载评论中...