Curtis Eccardt's horizontal power band saw (Emerson Electric, US 4,364,294, 1982), built from welded steel channel and tube instead of iron castings to cut its cost. The saw head swings down on trunnions over the bed; a hydraulic cylinder with a valve sets how fast it feeds, a spring counterbalances it, and a spring tensioner shows the blade tension on a scale. Two guides with rollers twist the blade's lower run 90° so its teeth face down into the work, and carbide inserts hold it there. The patent gives no sizes, speeds or ratings; the welder and wrenches are ours. The picture: the patent's Fig. 1.
高级
4 days

说明

1

Weld the bed

Stand two steel channels (9a, 9b) parallel, webs upright and flanges facing in, and weld gussets (15) between their webs. Bolt a bed plate (17) across the top flanges as the work surface. Ours: MIG welder, drill press for the bolt holes.

此步骤所需材料:

槽钢槽钢2 个
低碳钢板低碳钢板1 个
六角头螺栓 - 8.8 级六角头螺栓 - 8.8 级1 个

所需工具:

MIG 焊机MIG 焊机
台钻台钻
活动扳手活动扳手
2

Weld and bolt on the legs

Weld formed sheet-steel legs onto horizontal floor members to make front and rear leg weldments (19, 21), and bolt them under the bed.

此步骤所需材料:

钢板钢板1 个
结构钢管结构钢管1 个
六角头螺栓 - 8.8 级六角头螺栓 - 8.8 级1 个

所需工具:

MIG 焊机MIG 焊机
活动扳手活动扳手
3

Weld the head

Weld a head post (25) of square or rectangular steel tube square to a head beam (27) of rectangular tube. Weld a bracket leg (29) down from the beam's outer end, and fix support plates at both ends (31, 33).

此步骤所需材料:

结构钢管结构钢管1 个
低碳钢板低碳钢板1 个

所需工具:

MIG 焊机MIG 焊机
4

Fit the trunnions and align the pivot

Fix a shaft through the head post with its ends out as trunnions (55a, 55b), in bushings in two bearing blocks (59a, 59b) bolted inside the channel webs. Each block has one close-fit bolt hole and three oversize ones: shift the blocks until the pivot is parallel to the bed plate, then torque the bolts. A set screw (67) takes out end play.

此步骤所需材料:

钢轴钢轴1 个
金属衬套金属衬套2 个
轴承座轴承座2 个
六角头螺栓 - 8.8 级六角头螺栓 - 8.8 级8 个
凹端紧定螺钉凹端紧定螺钉1 个

所需工具:

台钻台钻
扭力扳手扭力扳手
5

Mount motor, belt drive and gearbox

Mount the electric motor (37) on a plate (38) pivoted on the head beam, and couple it by a multi-speed belt and pulleys (41) to a gearbox (39). Fit the drive wheel (43) on the gearbox output shaft.

此步骤所需材料:

电动机电动机1 个
低碳钢板低碳钢板1 个
传动带传动带1 个
滑轮滑轮1 个
齿轮箱齿轮箱1 个
带锯轮带锯轮1 个

所需工具:

活动扳手活动扳手
6

Build the idler tensioner

Weld an idler yoke (87) of rolled steel plate, pivot it on the head beam with a pin (89), and cantilever the idler axle from it with the idler wheel (45) on bearings (85). A threaded rod (91) pulls the yoke through a coil spring (93) held between compression plates and a U-bolt (97); a knob (99) turns the rod. An indicator (101) on the spring reads the tension on a scale (103).

此步骤所需材料:

低碳钢板低碳钢板1 个
钢销钢销1 个
钢轴钢轴1 个
带锯轮带锯轮1 个
滚珠轴承滚珠轴承1 个
全螺纹杆全螺纹杆1 个
Coil SpringCoil Spring1 个
U 形螺栓U 形螺栓1 个
控制旋钮控制旋钮1 个

所需工具:

MIG 焊机MIG 焊机
活动扳手活动扳手
7

Build the two blade guides

In each guide channel (111) mount two guide rollers (115a, 115b) on ball bearings on eccentric bushings, one fixed and one adjusted to the blade thickness. Add a carbide thrust insert (133) on the blade's back edge and two carbide side inserts (137a fixed, 137b on a sprung swing bracket set by a bolt and knob). Clamp the guides on two bar tracks (107).

此步骤所需材料:

导向滚轮导向滚轮4 个
滚珠轴承滚珠轴承4 个
偏心衬套偏心衬套4 个
硬质合金镶块硬质合金镶块6 个
Coil SpringCoil Spring2 个
控制旋钮控制旋钮2 个
结构钢管结构钢管1 个

所需工具:

活动扳手活动扳手
8

Fit the blade and set the tension

By hand, run the endless blade (47) round the drive and idler wheels and through both guides; the rollers twist its lower run about 90° so the teeth face down. Turn the tension knob until the scale shows the tension you want.

此步骤所需材料:

带锯条带锯条1 个
9

Fit the feed cylinder and counterbalance

Connect a hydraulic cylinder (71) between bed channel and head post above the trunnions, filled with oil and piped through tubing (75) to a control valve (73): the valve sets the feed rate and, closed, holds the head. Fit a coil spring (78) on a threaded linkage (79) between an end gusset and the head post below the trunnions, adjusted by a knob (80), to counterbalance the head.

此步骤所需材料:

液压缸液压缸1 个
液压油液压油1 batch
液压管液压管1 个
流量控制阀流量控制阀1 个
Coil SpringCoil Spring1 个
全螺纹杆全螺纹杆1 个
控制旋钮控制旋钮1 个

所需工具:

活动扳手活动扳手
10

Bolt on the vice

Bolt the quick-acting vice to the bed plate to clamp the work square under the blade.

此步骤所需材料:

机用虎钳机用虎钳1 个
六角头螺栓 - 8.8 级六角头螺栓 - 8.8 级1 个

所需工具:

活动扳手活动扳手

材料

29

所需工具

4

CC0 公共领域

此蓝图以 CC0 协议发布。你可以自由复制、修改、分发和使用此作品,无需征得许可。

通过购买蓝图中的产品支持创客,他们将获得 创客佣金 (由供应商设定),或创建此蓝图的新版本并将其作为连接包含在你自己的蓝图中以分享收入。

讨论

(0)

登录 加入讨论

加载评论中...