An ore jig sorts crushed ore by weight: a box with a screen bottom is jerked up and down in a tank of water, so the heavy mineral settles to the bottom of the bed and the light rock stays on top to be skimmed off. Robert H. Richards' Ore Dressing (1903) gives the sizes of the movable-sieve Cornish jigs at his Mill 12: a box of 1-inch boards 22 by 46 inches with a 5-mesh screen, worked by a lever and an eccentric in a tank 7 feet deep, with 6-minute jigging charges skimmed by hand. He does not say what the tank, lever and eccentric are made of; those are Unknown here. Source: R. H. Richards, Ore Dressing vol. I (1903), § 383, p. 506. Picture: his Figs. 300a-300d, the hand jig at Mill 2.
中级
Several days to build

说明

1

Read Richards

"These differ from the continuous, movable sieve jigs in that the feeders, the hydraulic water, the discharges for coarse concentrates, hutches and tailings, are all left out. They are practically hand jigs adapted to power."
2

Build the jigging box

Make the jigging box of 1-inch boards, 22 inches wide and 46 inches long, with a 5-mesh screen across it so that the box stands 7 inches deep above the screen and 3 inches below it.

此步骤所需材料:

木板材木板材1 1-inch boards
粗孔筛网粗孔筛网1 5-mesh

所需工具:

木工锯木工锯
锤子锤子
卷尺卷尺
3

Hang it in the tank on a lever

Set up a tank 30 inches wide, 54 inches long and 7 feet deep, full of water. Hang the box in it from a jigging lever with a long arm of 4 feet 2 inches and a short arm of 10 inches, the box on the short arm, as in the hand jig of Figs. 300a-300c. Drive the long arm from an eccentric with a 5-inch throw, which gives the box a 1-inch stroke. Put a hitching post beside the jig to hold the sieve up out of the water. The materials of the tank, lever, eccentric and post are not given (unknown).

此步骤所需材料:

未知材料未知材料1 tank, lever, eccentric, hitching post

所需工具:

木工锯木工锯
锤子锤子
卷尺卷尺
4

Jig a charge

Feed ore crushed to 2 mesh and finer. Shovel it into the jigging box until the bed is 8 inches deep, connect the lever to the power and jig for 6 minutes. Then disconnect it, lift the sieve out of the water and hitch it to the post.

所需工具:

铁锹铁锹
5

Skim by hand

Skim the bed off in layers: the top skimmings are waste, the middlings go back to be jigged again, and the coarse concentrates at the bottom go to the smelter. What falls through the screen (the hutch) is left to collect in the tank and finally shoveled out for the next, finer jigs.

所需工具:

铁锹铁锹
6

History and honest limits

Richards was professor of mining engineering and metallurgy at the Massachusetts Institute of Technology. At Mill 12 four such jigs worked as No. 1 jigs, followed by two No. 2 and nine No. 3 jigs like them; at the Hartman mine in Pennsylvania a similar jig was worked on a 1-inch bed of coarse limestone tailings, adding 2-inch layers of ore. He gives the sizes of the box, lever, eccentric and tank, but not their materials (except the 1-inch boards) or the fastenings; the tools are ours.

材料

3
  • 1 1-inch boards
    占位符
  • 1 5-mesh
    占位符
  • 1 tank, lever, eccentric, hitching post
    占位符

所需工具

4
  • 占位符
  • 占位符
  • 1 vendor sell this, none ship to you yet
    占位符
  • 占位符

CC0 公共领域

此蓝图以 CC0 协议发布。你可以自由复制、修改、分发和使用此作品,无需征得许可。

通过购买蓝图中的产品支持创客,他们将获得 创客佣金 (由供应商设定),或创建此蓝图的新版本并将其作为连接包含在你自己的蓝图中以分享收入。

讨论

(0)

登录 加入讨论

加载评论中...