艺术
美容与健康
工艺
文化与历史
娱乐
环境
食品与饮料
逆向工程
科学
体育
技术
可穿戴设备
Solenoid: Iron-Clad Valve Magnet with Two Coils, 1860 and 1765 Turns (Nachod 1905, in Underhill 1910)
Charlie

创建者

Charlie

31. 十月 2026DE
1
0
0
0
0

Solenoid: Iron-Clad Valve Magnet with Two Coils, 1860 and 1765 Turns (Nachod 1905, in Underhill 1910)

A short-stroke solenoid that opens an air valve. One coil pulls the iron armature down; a second, weaker coil holds it there against the air pressure once the first is switched off. A cast-iron shell closes the magnetic circuit around both. Result: an iron-clad plunger solenoid driving a brass valve rod through its hollow core. Source: C. P. Nachod's test (Electrical World, 1905) in Underhill, Solenoids, Electromagnets and Electromagnetic Windings (1910), pp. 125-129. Unknown: the wire insulation; the test does not give it. Not given: shell and armature sizes, voltage. Picture drawn by Youblob.
高级
2 days

说明

1

Turn the core and armature

Turn the core from Norway iron to 3.17 cm outside diameter and bore a 0.95 cm hole through it for the valve rod. Turn the armature from the same iron. Ours: wrought iron bar; the armature size is not given.

此步骤所需材料:

锻铁条锻铁条1 as required

所需工具:

车床刀具套装(HSS)车床刀具套装(HSS)
2

Cast the shell and top

Cast the shell and top in cast iron so they close the magnetic circuit round the coils, leaving a round clearance gap for the armature in the top. Sizes: not given (Underhill's Fig. 92 shows the layout).

此步骤所需材料:

生铁锭生铁锭1 as required

所需工具:

冲天炉冲天炉
铸造砂箱铸造砂箱
铸造砂铸造砂
3

Wind coil A: 1860 turns of No. 25

Wind the operating coil, 1860 turns of No. 25 wire, and place it where it encircles the working air gap between armature and core. Copper, as Underhill gives for magnet windings. Unknown: the insulation; the test does not give it.

此步骤所需材料:

铜线铜线1 as required
未知绝缘材料未知绝缘材料1 as required

所需工具:

车床刀具套装(HSS)车床刀具套装(HSS)
4

Wind coil B: 1765 turns of No. 26

Wind the retaining coil, 1765 turns of No. 26 wire, and place it below coil A on the core. Being away from the gap, it pulls only 0.4-0.8 as hard as A, enough to hold the armature down.

此步骤所需材料:

铜线铜线1 as required

所需工具:

车床刀具套装(HSS)车床刀具套装(HSS)
5

Assemble with the brass valve rod

Fit core, coils and armature in the shell and pass the brass rod through the core to the valve. Nachod set test gaps of 0.41 and 2.05 mm with brass washers.

此步骤所需材料:

黄铜棒黄铜棒1 as required

所需工具:

车床刀具套装(HSS)车床刀具套装(HSS)

材料

5

所需工具

4

相关蓝图

这些蓝图共享知识——技术、材料或原理

CC0 公共领域

此蓝图以 CC0 协议发布。你可以自由复制、修改、分发和使用此作品,无需征得许可。

通过购买蓝图中的产品支持创客,他们将获得 创客佣金 (由供应商设定),或创建此蓝图的新版本并将其作为连接包含在你自己的蓝图中以分享收入。

讨论

(0)

登录 加入讨论

加载评论中...