Zusammenarbeit
KUNST
SCHÖNHEIT & WELLNESS
HANDWERK
KULTUR & GESCHICHTE
UNTERHALTUNG
UMFELD
ESSEN & GETRÄNKE
REVERSE ENGINEERING
WISSENSCHAFTEN
SPORT
TECHNOLOGIE
WEARABLES

Copper Concentrate: Sulphide Ore Stamped, Jigged and Tabled at the Anaconda Mill (Richards, Ore Dressing 1903)
Copper sulphide ore is too lean to smelt as mined. At the Anaconda mill it was screened, crushed under steam stamps, sorted by settling speed in rising water, and run over jigs and slime tables, where the heavy copper minerals sink and the light quartz and feldspar wash away.
Result: concentrates of 12 to 20 % copper; 100 tons of ore gave 50 to 75 tons. The mill handled 2,500 to 2,700 tons a day.
Source: Robert H. Richards, Ore Dressing vol. II (1903), pp. 984-986, Mill No. 42, Anaconda Copper Mining Company. Not given: the copper in the ore, water per ton. Picture drawn by Youblob.
Erfahren
1 day
Anweisungen
1
1
Sort the ore
Sort the ore
In the mine, pick the ore by hand into rich ore (straight to the smelter), hard concentrating ore and soft concentrating ore. The ore holds chalcocite, chalcopyrite, pyrite, enargite and blende in quartz and decomposed feldspar; the aim is to save the copper and silver without the zinc.
Materialien für diesen Schritt:
Kupfersulfiderz100 tons2
2
Screen and pick
Screen and pick
Pass each kind over vibrating grizzlies with 1 in spaces; hand-pick the oversize for rich ore. Screen the undersize in trommels: 6.35 mm round holes for hard ore; 12.7 mm then 6.35 mm for soft ore.
Benötigte Werkzeuge:
Klassiersieb
Siebtrommel3
3
Crush under steam stamps
Crush under steam stamps
Crush the coarse hard ore under steam stamps with screens of 4.76 x 9.52 mm slots, the soft ore under stamps with 12.7 mm round holes. Richards notes that steam stamps were later given up for these ores.
Benötigte Werkzeuge:
Pochwerk
Wasser4
4
Classify and jig
Classify and jig
Jig the coarse soft ore on 1-sieve Harz jigs. Send all fine ore to hydraulic classifiers with three spigots; each spigot feeds its own row of 2-sieve Collom jigs. The heavy concentrate is drawn from the jigs; middlings are crushed again.
Benötigte Werkzeuge:
Setzmaschine
Stromklassierer
Wasser5
5
Table the slimes and collect
Table the slimes and collect
Run the classifier overflow over convex revolving slime tables. Gather all concentrates and settlings for the smelter: 12 to 20 % copper, 50 to 75 tons from 100 tons of ore. Tailings keep 1 1/4 to 2 % copper.
Benötigte Werkzeuge:
Rundherd
AbsetzbeckenMaterialien
1- 100 tonsPlatzhalter
Dieser Bauplan stellt her
CC0 Gemeinfrei
Dieser Blueprint ist unter CC0 veröffentlicht. Sie dürfen dieses Werk für jeden Zweck frei kopieren, ändern, verbreiten und verwenden, ohne um Erlaubnis zu fragen.
Unterstützen Sie den Maker, indem Sie Produkte über seinen Blueprint kaufen, wo er eine Maker-Provision von Anbietern festgelegt, verdient. Oder erstellen Sie eine neue Iteration dieses Blueprints und verbinden Sie ihn in Ihrem eigenen Blueprint, um Einnahmen zu teilen.
