Zusammenarbeit
KUNST
SCHÖNHEIT & WELLNESS
HANDWERK
KULTUR & GESCHICHTE
UNTERHALTUNG
UMFELD
ESSEN & GETRÄNKE
REVERSE ENGINEERING
WISSENSCHAFTEN
SPORT
TECHNOLOGIE
WEARABLES

Pressure Reactor: the Cast-Iron Autoclave with Bolted Cover (Thorpe, 1912)
The chemical works' autoclave, built on Papin's digester: a closed cast-iron vessel with a flanged cover bolted down on a lead washer, a pressure gauge, a safety valve and a thermometer tube. It heats liquids above their boiling points, often at 20 to 30 atmospheres, in a bath of hot oil or molten lead.
Variable: the material (cast iron, steel, copper, sheet iron) and lining (enamel, tin, lead, copper or zinc).
Source: Thorpe, Dictionary of Applied Chemistry, vol. I (1912), pp. 343-344. Unknown: sizes, wall thickness. Picture: Fig. 3 of the book.
Experte
Unknown
Anweisungen
1
1
Cast the body and cover
Cast the body and cover
Make the vessel of cast iron (or steel; occasionally copper, sheet iron or sheet steel), with a flange for the cover (Figs. 1-3). Cast-iron vessels are sometimes strapped with steel rings for safety. Not given: sizes and wall thickness.
Materialien für diesen Schritt:
Eisengussteile2 body, cover
Baustahl-Flachstahl1 rings, optionalBenötigte Werkzeuge:
Unbekannte Maße2
2
Fit gauge, valve and thermometer tube
Fit gauge, valve and thermometer tube
Fit a pressure gauge, a safety valve and tubes for thermometers. If the charge would attack the iron, enamel the inside or line it with sheet tin, lead, copper or zinc soldered tight to the wall.
Materialien für diesen Schritt:
Manometer1 Stück
Unbekanntes Ventil1 safety valve
Eisenrohr1 thermometer tubeBenötigte Werkzeuge:
Maulschlüsselsatz3
3
Close the cover
Close the cover
Close it with a screwed or flanged cover bearing on a lead washer, bolted down evenly.
Materialien für diesen Schritt:
Bleiblech1 washer
Sechskantschraube - Festigkeitsklasse 8.81 flange bolts, number not givenBenötigte Werkzeuge:
Maulschlüsselsatz4
4
Pressure-test and heat
Pressure-test and heat
Because it must hold 20 to 30 atmospheres, test it with hydraulic (water) pressure before use. In service, heat it by circulating hot oil or by standing it in a bath of molten lead.
Benötigte Werkzeuge:
Handprüfpumpe
Wasser
BleibadMaterialien
7- 2 body, coverPlatzhalter
- 1 rings, optionalPlatzhalter
- 1 StückPlatzhalter
- 1 safety valvePlatzhalter
- 1 thermometer tubePlatzhalter
- 1 washerPlatzhalter
- 1 flange bolts, number not givenPlatzhalter
Dieser Bauplan stellt her
CC0 Gemeinfrei
Dieser Blueprint ist unter CC0 veröffentlicht. Sie dürfen dieses Werk für jeden Zweck frei kopieren, ändern, verbreiten und verwenden, ohne um Erlaubnis zu fragen.
Unterstützen Sie den Maker, indem Sie Produkte über seinen Blueprint kaufen, wo er eine Maker-Provision von Anbietern festgelegt, verdient. Oder erstellen Sie eine neue Iteration dieses Blueprints und verbinden Sie ihn in Ihrem eigenen Blueprint, um Einnahmen zu teilen.
