Collaboration
ART
BEAUTÉ ET BIEN-ÊTRE
ARTISANAT
CULTURE ET HISTOIRE
DIVERTISSEMENT
ENVIRONNEMENT
NOURRITURE ET BOISSONS
INGÉNIERIE INVERSE
SCIENCES
SPORTS
TECHNOLOGIE
TECHNOLOGIE PORTABLE

Bismuth: Sweated Out of Native Ore in Inclined Iron Tubes, the Schneeberg Way (Thorpe, 1912)
The old way of getting bismuth from ore that holds it as the metal: heat the lumps just enough in sloping iron tubes and the bismuth, which melts easily, runs out of the rock into pots under charcoal. It takes 30-60 minutes a charge but gets only about two-thirds of the metal.
Not given: the furnace temperature.
Source: E. Thorpe, Dictionary of Applied Chemistry vol. I (1912), Bismuth, p. 458. Picture: Thorpe's Fig. 1, the furnace in plan.
Intermédiaire
30-60 minutes per charge
Consignes
1
1
Pick and break the ore
Pick and break the ore
Sort the ore (7-12 % bismuth) by hand from the waste rock as far as possible and break it into pieces the size of a hazel nut.
Matériaux pour cette étape :
Minerai de bismuth natif1 12 cwt per tube chargeOutils nécessaires :
Marteau
Bascule industrielle à plateforme2
2
Charge the tubes
Charge the tubes
Load about 12 cwt into each inclined iron tube of the furnace, leaving room to stir from the upper end. Close the upper ends with iron plates and the lower ends with plates pierced with round holes. Under each lower end stand an iron pot holding powdered charcoal, kept gently warm by a small charcoal fire.
Matériaux pour cette étape :
Charbon de bois1 powdered, in the pots and for the pot fireOutils nécessaires :
Four de liquation du bismuth
Creuset en fonte3
3
Sweat out the bismuth
Sweat out the bismuth
Fire the furnace with wood so that the metal flows easily. In about 10 minutes the bismuth begins to run into the pots, where the charcoal covers it from the air. Stir the ore now and then with an iron rod from the upper end; in 30-60 minutes the charge is done. 20 cwt of ore burns about 63 cubic feet of wood.
Matériaux pour cette étape :
Bois de chauffage1 about 63 cu ft per 20 cwt of oreOutils nécessaires :
Four de liquation du bismuth
Tige de fer4
4
Rake out and recharge
Rake out and recharge
Rake the spent ore (bismuth barley) out of the upper end into the tank and refill at once with fresh ore.
Outils nécessaires :
Râteau en fer
Four de liquation du bismuth5
5
Cast ingots
Cast ingots
Ladle the bismuth from the pots into moulds and cast ingots of 25-50 lb.
Outils nécessaires :
Creuset en fonte
Poche de fonderie
LingotièreMatériaux
3- 1 12 cwt per tube chargeEspace réservé
- 1 powdered, in the pots and for the pot fireEspace réservé
- 1 about 63 cu ft per 20 cwt of oreEspace réservé
Outils requis
8- Espace réservé
- Espace réservé
- Espace réservé
- Espace réservé
- Espace réservé
- Espace réservé
- Espace réservé
- Espace réservé
Ce plan fabrique
CC0 Domaine public
Ce blueprint est publié sous CC0. Vous êtes libre de copier, modifier, distribuer et utiliser ce travail pour tout usage, sans demander la permission.
Soutenez le Maker en achetant des produits via son Blueprint où il perçoit une Commission Maker définie par les Vendeurs, ou créez une nouvelle itération de ce Blueprint et incluez-le comme connexion dans votre propre Blueprint pour partager les revenus.
