Kolaborasi
SENI
KECANTIKAN & KESEHATAN
KERAJINAN
BUDAYA & SEJARAH
HIBURAN
LINGKUNGAN
MAKANAN & MINUMAN
REKAYASA BALIK
ILMU PENGETAHUAN
OLAHRAGA
TEKNOLOGI
PERANGKAT PAKAI
Woven-Reed Footstool: Nailed Dowel Frame, Wound Posts, Woven Top and Pairing-Weave Apron (Boy Mechanic, 1919)
Tex

Dibuat oleh

Tex

14. November 2026FO
7
0
0
0
0

Woven-Reed Footstool: Nailed Dowel Frame, Wound Posts, Woven Top and Pairing-Weave Apron (Boy Mechanic, 1919)

Charles M. Miller's reed footstool from The Boy Mechanic, Book 3 (1919): a frame of 3/4 in dowel rails and posts with crossed 5/8 in braces, nailed through drilled holes, the posts and rails wound with flat reed, the top woven over No. 4 spokes and the apron in pairing weave, finished with a broken-down roll.
Menengah
About 2 days

Instruksi

1

Cut list

Memuat notebook Jupyter…
2

Read The Boy Mechanic, Book 3

"Each piece of reed furniture has a framework, usually of dowels." The reed sizes are those of his reed basket (Boy Mechanic, Book 2).
3

Cut and drill the frame

Cut two side rails 3/4 by 14 in, two end rails 3/4 by 9 in, four posts 3/4 by 7 in and two braces 5/8 by 17 in (trimmed to fit later). Notch the rail and brace ends with a coping saw to seat on the posts. Before assembly drill the spoke holes, 1/8 in for No. 4 reed, combining the top and end-side spoke holes as in Fig. 4 and drilling the side-rail holes straight (Fig. 2).

Material untuk langkah ini:

Batang Dowel KayuBatang Dowel Kayu4 buah

Alat yang dibutuhkan:

Gergaji CopingGergaji Coping
Bor tanganBor tangan
PensilPensil
Meteran GulungMeteran Gulung
4

Nail the frame

Run the posts to the top of the frame and nail through them into the rail ends with ordinary 4-penny nails, drilling 1/16 in holes first. Set the side rails about 1/16 in below the post tops. Halve the braces at the centre on a slant so their tops lie level, try them, and nail them without pulling the frame out of square (Fig. 1).

Material untuk langkah ini:

PakuPaku1 buah

Alat yang dibutuhkan:

Bor tanganBor tangan
PaluPalu
Gergaji CopingGergaji Coping
5

Wind the posts and end rails

Cover the post tops with short pieces of winding reed tacked on with shoemaker's tacks, crossing in turn (Figs. 5, 6). Wind the end rails, marking each hole with pencil as the winding passes it; then open each hole through the winding with a bodkin (Fig. 7).

Material untuk langkah ini:

Bambu belahBambu belah1 buah
Paku penahan atasanPaku penahan atasan1 buah

Alat yang dibutuhkan:

PaluPalu
Penusuk (Uncek)Penusuk (Uncek)
PensilPensil
6

Weave the top

Put the 32 in No. 4 spokes through one end rail, down and out at the ends. Weave with a single No. 3 weaver, and after 3/4 in add a short extra spoke beside each spoke, weaving the pair as one; wind the weaver twice round the side rail each time. Insert the spokes in the other end rail before the weaving is within 2 or 3 in of it (Fig. 8).

Material untuk langkah ini:

RotanRotan1 buah

Alat yang dibutuhkan:

GuntingGunting
Ember 20 LiterEmber 20 Liter
Bunga karangBunga karang
7

Wind braces and posts, weave the apron

Wind the braces and posts, three strips round the post and tacked where each brace meets it, and both braces together where they cross (Fig. 9); finish the posts with brass caps or wind to within 1/8 in of the bottom. With the stool upside down, insert short spokes in the under side of the side rails and weave the apron in pairing weave, always passing one weaver twice round each post (Figs. 10-12). Cut the extra spokes even and break down the spokes into a roll, tucking the ends inside (Figs. 13-15). Singe off stray fibres carefully with a gas flame or blowtorch.

Material untuk langkah ini:

Bambu belahBambu belah1 buah
RotanRotan1 buah
Paku penahan atasanPaku penahan atasan1 buah

Alat yang dibutuhkan:

GuntingGunting
Obor PropanaObor Propana
Bunga karangBunga karang
Ember 20 LiterEmber 20 Liter
8

Troubleshooting

Reed weaving troubleshooting.

Flow

Loading...
9

History and honest limits

From "A Woven-Reed Footstool" by Charles M. Miller, in **The Boy Mechanic, Book 3**, Popular Mechanics, 1919 (Project Gutenberg 71856; checked on the archive.org scan boymechanic0003unse, pp. 255-258). Fig. 2 shows the hole positions without figures, and he mentions an optional chloride-of-lime bleach that we leave out. The tools and metric figures are ours.

Bahan

5
  • Placeholder
  • 1 buah
    Placeholder
  • Placeholder
  • Placeholder
  • 1 buah
    Placeholder

Alat yang Diperlukan

10
  • Placeholder
  • Placeholder
  • 1 vendor sell this, none ship to you yet
    Placeholder
  • 1 vendor sell this, none ship to you yet
    Placeholder
  • Placeholder
  • Placeholder
  • Placeholder
  • Placeholder
  • Placeholder
  • Placeholder

Cetak biru ini membuat

CC0 Domain Publik

Cetak biru ini dirilis di bawah CC0. Anda bebas untuk menyalin, memodifikasi, mendistribusikan, dan menggunakan karya ini untuk tujuan apa pun, termasuk komersial, tanpa meminta izin.

Dukung Maker dengan membeli produk melalui Cetak Biru mereka di mana mereka mendapatkan Komisi Pembuat yang ditetapkan oleh Penjual, atau buat iterasi baru dari Cetak Biru ini dan masukkan sebagai koneksi di milik Anda sendiri.

Diskusi

(0)

Masuk untuk bergabung dengan diskusi

Memuat komentar...