The Clapboard Gauge: One Man, Straight Siding, Even in the Wind

Siding put on with compasses and set-nails takes two men, mars the boards with nail holes, and lets each course drift a little from the last. Stephen Inman of Rockford, Illinois, received US 33,199, dated 3 September 1861, for a combined siding hook and gauge "so arranged as to combine in one and to answer the purpose of a square, siding-hook, chalk-line, compasses, and set-nails used in siding up buildings". Its lip catches under the course already nailed, a cross-piece squares it to the board, an adjustable slider sets the exposure, and springs hold the next board in place, so "only one is required, for the springs N keep the siding in place." This rung works out how much straighter a gauge keeps the courses, then builds two gauges from hardwood and lays strips on a mock wall.
Menengah
About 4 hours

Instruksi

1

Course error, measured against gauged

Memuat notebook Jupyter…
2

Square to the board

The embedded blueprint trues a try square. Inman's cross-piece does the square's job on the wall, bringing the gauge at right angles to the siding.
3

Read US 33,199

"In Fig. 1, E is a shank, to the upper part of which is secured the wedge or lip F, that is forced up between two pieces of siding to hold the hook in place. On the outside of this shank is secured by means of the thumb-screw J the slider or standard H, that forms a rest K on the top and terminates in the piece L, to which is jointed the gage M." "In the way siding is usually put on, compasses have to be used to measure the distance and then set-nails driven in, which consumes much time and mars the siding with the holes after the nails are withdrawn, and does not insure as much accuracy of measurement as where two or more of these hooks are used, if they are adjusted and placed in the siding just alike."
4

Build two gauges and side a mock wall

**Shank and lip.** For each gauge, saw a shank 30 × 3 cm from hardwood board and glue a thin wedge-shaped lip across its top face to slip up under the bottom edge of a board. Screw a cross-piece across the shank just below the lip so it bears against the face of the course below and squares the gauge. **Slider.** Saw a slider 12 × 3 cm, cut a slot 6 cm long down it with the coping saw, and hold it on the shank with a bolt and nut through the slot, so it can be set to the exposure. Screw a block across its top as the rest the next board sits on. **Spring.** Screw a curved strip of spring steel to the slider so it presses the new board against the wall. **Test.** Screw a plywood sheet upright as the wall and cut strips 10 cm wide from pine board as siding. Nail the first strip level. Set both gauges to 7 cm exposure, hook them under it, rest the next strip on them, and nail it. Repeat for eight courses. Side a second sheet by marking each course with the ruler and pencil. Measure each course's exposure with the caliper on both walls and compare the spread.

Material untuk langkah ini:

Papan Kayu KerasPapan Kayu Keras1 buah
Lembaran kayu lapisLembaran kayu lapis1 buah
Papan pinusPapan pinus2 buah
Pita baja pegasPita baja pegas1 buah
Aneka baut segi enamAneka baut segi enam1 buah
Mur Segi EnamMur Segi Enam2 buah
Sekrup kayuSekrup kayu12 buah
Lem KayuLem Kayu5 ml
PakuPaku40 buah

Alat yang dibutuhkan:

Gergaji TanganGergaji Tangan
Gergaji CopingGergaji Coping
Bor Tanpa KabelBor Tanpa Kabel
Set Mata BorSet Mata Bor
Set obengSet obeng
Kunci InggrisKunci Inggris
PaluPalu
Siku-siku tetapSiku-siku tetap
PenggarisPenggaris
Jangka Sorong Digital 6 InciJangka Sorong Digital 6 Inci
PensilPensil
5

Siding that runs out of level, slips or gaps

Clapboard gauge troubleshooting.

Flow

Loading...
6

History and honest limits

**Stephen Inman** of Rockford, Winnebago County, Illinois, received US 33,199, dated 3 September 1861. His slider was adjusted by ratchets and a hand-screw, the gauge was jointed so it could be lifted when a board had to be scribed round a window, and he did not claim the metal siding hook itself, only the cross-piece combined with the gauge. **Honest limits.** Hardwood, a slotted slider and a spring-steel strip stand in for his hook, ratchet slider and springs, and a plywood mock wall for a building. The notebook's per-course errors are examples, not measurements. Your caliper readings are the result.

Bahan

9

Alat yang Diperlukan

11
  • Placeholder
  • Placeholder
  • 1 vendor sell this, none ship to you yet
    Placeholder
  • Placeholder
  • Placeholder
  • Placeholder
  • Placeholder
  • Placeholder
  • Placeholder
  • Placeholder
  • 1 vendor sell this, none ship to you yet
    Placeholder

CC0 Domain Publik

Cetak biru ini dirilis di bawah CC0. Anda bebas untuk menyalin, memodifikasi, mendistribusikan, dan menggunakan karya ini untuk tujuan apa pun, termasuk komersial, tanpa meminta izin.

Dukung Maker dengan membeli produk melalui Cetak Biru mereka di mana mereka mendapatkan Komisi Pembuat yang ditetapkan oleh Penjual, atau buat iterasi baru dari Cetak Biru ini dan masukkan sebagai koneksi di milik Anda sendiri.

Diskusi

(0)

Masuk untuk bergabung dengan diskusi

Memuat komentar...