هنر
زیبایی و سلامت
صنایع دستی
فرهنگ و تاریخ
سرگرمی
محیط زیست
غذا و نوشیدنی
مهندسی معکوس
علوم
ورزش
فناوری
پوشیدنیها

Gear Motor: Small Motor on a Three-Shaft Box of Floating Gears (Swenson 1959)
A small motor with a reduction gearbox bolted on. Swenson's box has only three shafts: the motor shaft with its pinion, a fixed stub shaft, and the output shaft. The gears ride free on the two shafts in pairs and pass the drive back and forth between them, slower at each step. Only the last gear is fixed to the output shaft.
Source: Thure R. Swenson, US 2,908,180 (1959). Unknown: the motor, the fibre gear material, the thrust bearing, the metals, and every size and ratio. Swenson gives none of these, so they are linked to unknown heads. The machining is ours. Picture: the patent's drawing.
متخصص
3 days
دستورالعملها
1
1
Make the housing and cover
Make the housing and cover
Make the gearbox: a housing with mounting bosses for the motor (Swenson's is a die-casting) and a front cover plate held by screws. Bore the housing for the motor-shaft nipple and for the output shaft's inner bearing, and form a seat in the cover for the outer sleeve bearing. Unknown: the metal and the sizes.
مواد مورد نیاز این مرحله:
فلز نامعلوم1 as requiredابزارهای مورد نیاز:
تراش فلز
ست ابزار تراش (HSS)
دریل ستونی
مجموعه قلاویز و حدیده
ابعاد نامعلوم2
2
Cut the gears and shafts
Cut the gears and shafts
Make the stub shaft and the output shaft. Cut the train: a small pinion for the motor shaft; a fibre gear 34 with a pinion fixed to it; gear 23 with pinion; gear 35 with pinion; gear 24 with pinion; and the final gear 36. Unknown: the tooth numbers and ratios.
مواد مورد نیاز این مرحله:
فلز نامعلوم1 as required
قطعه خام چرخدنده فیبری1 قطعهابزارهای مورد نیاز:
تراش فلز
دستگاه هابزنی چرخدنده
ابعاد نامعلوم3
3
Mount the motor with its front bearing on the housing
Mount the motor with its front bearing on the housing
The motor is conventional except for its front bearing: a casting held on the housing by screws, with a nipple fitting a bore in the housing and a sleeve bearing in the nipple. The motor shaft goes through it into the gearbox. Fix the small pinion on its end.
مواد مورد نیاز این مرحله:
موتور القایی کوچک1 قطعهابزارهای مورد نیاز:
مجموعه پیچگوشتی
پرس دستی4
4
Assemble the floating train
Assemble the floating train
On the output shaft, float the fibre gear (meshing with the motor pinion) and gear 35. On the stub shaft, float gears 23 and 24. Each drives the next by its pinion: 34 to 23, 23 to 35, 35 to 24, and 24 to the final gear 36. Press 36 onto the output shaft. Carry the output shaft in an inner bearing in the housing and a larger sleeve bearing in the cover, with a thrust ball bearing at its inner end. Screw the cover on.
مواد مورد نیاز این مرحله:
بلبرینگ کفگرد1 قطعهابزارهای مورد نیاز:
پرس دستی
مجموعه پیچگوشتیمواد
4- 1 as requiredجایگزین
- 1 قطعهجایگزین
- 1 قطعهجایگزین
- 1 قطعهجایگزین
این نقشه میسازد
نقشههای مرتبط
این نقشهها دانش مشترکی دارند — تکنیکها، مواد یا اصول
CC0 مالکیت عمومی
این نقشه تحت مجوز CC0 منتشر شده است. شما آزاد هستید آن را کپی، ویرایش، توزیع و برای هر هدفی بدون نیاز به اجازه استفاده کنید.
با خرید محصولات از طریق نقشه از سازنده حمایت کنید و او کمیسیون سازنده تعیین شده توسط فروشندگان، دریافت میکند یا یک نسخه جدید از این نقشه ایجاد کنید و آن را به عنوان اتصال در نقشه خود قرار دهید تا درآمد به اشتراک گذاشته شود.

