Collaborazione
ARTE
BELLEZZA E BENESSERE
MESTIERE
CULTURA E STORIA
DIVERTIMENTO
AMBIENTE
CIBO E BEVANDE
INGEGNERIA INVERSA
SCIENZE
SPORT
TECNOLOGIA
INDOSSABILI

Bismuth: Sweated Out of Native Ore in Inclined Iron Tubes, the Schneeberg Way (Thorpe, 1912)
The old way of getting bismuth from ore that holds it as the metal: heat the lumps just enough in sloping iron tubes and the bismuth, which melts easily, runs out of the rock into pots under charcoal. It takes 30-60 minutes a charge but gets only about two-thirds of the metal.
Not given: the furnace temperature.
Source: E. Thorpe, Dictionary of Applied Chemistry vol. I (1912), Bismuth, p. 458. Picture: Thorpe's Fig. 1, the furnace in plan.
Intermedio
30-60 minutes per charge
Istruzioni
1
1
Pick and break the ore
Pick and break the ore
Sort the ore (7-12 % bismuth) by hand from the waste rock as far as possible and break it into pieces the size of a hazel nut.
Materiali per questo passaggio:
Minerale di bismuto nativo1 12 cwt per tube chargeStrumenti necessari:
Martello
Bilancia industriale a piattaforma2
2
Charge the tubes
Charge the tubes
Load about 12 cwt into each inclined iron tube of the furnace, leaving room to stir from the upper end. Close the upper ends with iron plates and the lower ends with plates pierced with round holes. Under each lower end stand an iron pot holding powdered charcoal, kept gently warm by a small charcoal fire.
Materiali per questo passaggio:
Carbone di legna1 powdered, in the pots and for the pot fireStrumenti necessari:
Forno di liquazione del bismuto
Crogiolo di ghisa3
3
Sweat out the bismuth
Sweat out the bismuth
Fire the furnace with wood so that the metal flows easily. In about 10 minutes the bismuth begins to run into the pots, where the charcoal covers it from the air. Stir the ore now and then with an iron rod from the upper end; in 30-60 minutes the charge is done. 20 cwt of ore burns about 63 cubic feet of wood.
Materiali per questo passaggio:
Legna da ardere1 about 63 cu ft per 20 cwt of oreStrumenti necessari:
Forno di liquazione del bismuto
Tondino di ferro4
4
Rake out and recharge
Rake out and recharge
Rake the spent ore (bismuth barley) out of the upper end into the tank and refill at once with fresh ore.
Strumenti necessari:
Rastrello di ferro
Forno di liquazione del bismuto5
5
Cast ingots
Cast ingots
Ladle the bismuth from the pots into moulds and cast ingots of 25-50 lb.
Strumenti necessari:
Crogiolo di ghisa
Siviera da fonderia
LingottieraMateriali
3- 1 12 cwt per tube chargeSegnaposto
- 1 powdered, in the pots and for the pot fireSegnaposto
- 1 about 63 cu ft per 20 cwt of oreSegnaposto
Strumenti richiesti
8- Segnaposto
- Segnaposto
- Segnaposto
- Segnaposto
- Segnaposto
- Segnaposto
- Segnaposto
- Segnaposto
Questo progetto realizza
CC0 Pubblico dominio
Questo progetto è rilasciato sotto CC0. Sei libero di copiare, modificare, distribuire e utilizzare quest'opera per qualsiasi scopo, senza chiedere permesso.
Supporta il Maker acquistando prodotti tramite il suo progetto dove guadagna una Commissione Maker stabilita dai venditori, oppure crea una nuova iterazione di questo progetto e includilo come collegamento nel tuo progetto per condividere i ricavi.