Rubber Compound: Raw Rubber Washed, Dried and Mixed with Sulphur on Hot Rolls (Thorpe, 1913)
How a rubber works of 1913 turned raw rubber into a 'mixing' ready for shaping and curing: the rubber is washed between corrugated rolls under running water, dried on racks, broken down on hot smooth rolls until plastic, and then worked together with fillers and finally sulphur into an even dough.
Very few goods were made of rubber and sulphur alone: pure mixings cost too much and are too soft for most uses.
Unknown: which fillers, and how much of them and of sulphur. Thorpe names the kinds of materials but gives no mixing.
Source: T. E. Thorpe, Dictionary of Applied Chemistry vol. IV (1913), pp. 586-587. Picture: Fig. 1, a washing machine.
中級者
3-4 days drying
手順
1
1
Steep and wash the rubber
Steep and wash the rubber
Cut the raw rubber into lumps or slabs and steep them for some hours in warm water. Pass them again and again through corrugated, diamond-cut or fluted rolls running at a speed difference of 6 : 4 down to one tooth, with a stream of water on the rubber, until the rough crepe-like sheet is clean and thin.
このステップの材料:
燻煙ゴムシート1 raw rubber
水1 warm, then running必要な工具:
ゴム用2本ロール機2
2
Dry on racks
Dry on racks
Hang the sheet on racks in a drying room until it holds only about 0.25-0.5 per cent moisture: about 3-4 days at about 80°F with good ventilation. Cooler, drier air is better, as warm rubber turns soft and tacky.
必要な工具:
乾燥棚3
3
Break it down
Break it down
Pass the dry rubber repeatedly through the steam-heated smooth rolls of the mixing machine, which run at different speeds, tightening the rolls gradually until the rubber is thoroughly plastic.
必要な工具:
ゴム用2本ロール機4
4
Mix in the fillers and sulphur
Mix in the fillers and sulphur
Add the other materials gradually: reclaimed rubber, ground waste, 'substitute' and other organic fillers first, then the minerals and the sulphur last. Work it into a thoroughly even dough without overworking ('tiring') the rubber.
このステップの材料:
不明な材料1 fillers and minerals; not given
硫黄粉末1 amount not given必要な工具:
ゴム用2本ロール機材料
4- 1 raw rubberプレースホルダー
- 1 warm, then runningプレースホルダー
- 1 fillers and minerals; not givenプレースホルダー
- 1 amount not givenプレースホルダー
この設計図で作るもの
CC0 パブリックドメイン
このブループリントはCC0で公開されています。許可を求めずに、自由にコピー、修正、配布、あらゆる目的で使用できます。
メイカーを応援するには、ブループリント経由で製品を購入してください。メイカーには メイカーコミッション がベンダーにより設定されています。または、このブループリントの新しいイテレーションを作成し、自分のブループリントにコネクションとして含めて収益を共有できます。