Setting a Gradient: Drainage Falls and the Boning Rod
Emma

작성자

Emma

23. 9월 2026SE
22
0
0
0
0

Setting a Gradient: Drainage Falls and the Boning Rod

The drainage tile, the septic tank and the constructed wetland already published here all share a requirement none of them explains: the pipe must fall at a specific, constant gradient, and both too little and too MUCH will stop it working. Too little and solids settle. Too much and the water runs away and leaves the solids behind — which surprises people, and is why a steep drain blocks as reliably as a flat one. The traditional figures, one in forty for a small foul drain and one in eighty for a larger one, are not arbitrary: they are the range where the flow stays fast enough to scour and slow enough to carry. Boning rods are how that gradient gets built without an instrument in the trench. Three T-shaped rods, two set on the known ends and one carried along, and your own eye does the interpolation.
중급
1 day

안내

1

Fix the two ends before anything else

Establish the invert level — the inside bottom of the pipe — at the start and at the outfall, using the levelling method from earlier in this batch. The outfall is usually fixed by something you do not control: an existing manhole, a ditch, a soakaway. Level it FIRST and work backwards, because discovering at the end of the trench that you needed 300 millimetres you have not got is the failure this whole rung exists to prevent.

이 단계의 재료:

나무못나무못6 개

필요한 도구:

광학 레벨 (측량)광학 레벨 (측량)
표척표척
2

Choose the gradient, and check it against both limits

Work out the fall available over the run, and compare it with what the pipe needs. For a 100 mm foul drain, 1 in 40 is the usual figure; for 150 mm, 1 in 60 to 1 in 80. Check BOTH ends of the range. A gradient far steeper than needed is a real fault, not a safety margin, and where the ground falls faster than the pipe should, the answer is a steep section plus a manhole or a backdrop — not a uniformly steep pipe.
3

Make a set of boning rods

Make three identical T-shaped rods — a vertical leg with a horizontal crosspiece — all exactly the same length, with the crosspieces painted a colour that stands out against soil. Identical is the whole trick, and the only tolerance that matters is between the three: cut them together and check them against each other, not against a tape. If they differ by 10 millimetres, your trench is wrong by 10 millimetres everywhere, and nothing in the method will tell you.

이 단계의 재료:

경사 시준 막대경사 시준 막대3 개
더글러스퍼 대들보더글러스퍼 대들보2 length

필요한 도구:

손톱(핸드소)손톱(핸드소)
줄자줄자
4

Set sight rails at each end and bone between them

Set a sight rail at each end of the run, each one exactly one boning-rod height above the intended invert at that point. The line joining the two rail tops is then parallel to the pipe, one rod height up. Stand behind one rail and sight across both. Anyone in the trench holds the third rod on the formation: when its crosspiece lines up exactly with the two rails, the trench is at the right depth. Your eye is doing linear interpolation over thirty metres, to a few millimetres, with no instrument.

이 단계의 재료:

더글러스퍼 대들보더글러스퍼 대들보4 length
아연 도금 못아연 도금 못20 개

필요한 도구:

손톱(핸드소)손톱(핸드소)
못뽑이 망치못뽑이 망치
광학 레벨 (측량)광학 레벨 (측량)
5

Lay to the invert, not to the top of the pipe

Bed each pipe so that the INSIDE BOTTOM sits on the line, and check every single one before backfilling. Pipes vary in wall thickness, so laying to the top of the barrel puts a step in the invert at each joint — and a step is where solids catch. Support the barrel along its length, never on the collars, and never pack it up on a stone: a pipe bearing on two hard points cracks under backfill.

필요한 도구:

경사 시준 막대경사 시준 막대
수평계수평계
6

Why too steep blocks a drain

Jupyter 노트북 불러오는 중…
7

Prove it with water before you backfill

Run a bucket of water down the finished pipe and watch it at the outfall. It should arrive promptly and completely, leaving nothing standing. Water is the only test that matters, it costs a bucket, and it is available exactly once — after backfilling, finding a reverse fall means digging the whole run out again. Put a spirit level in the trench along the pipe as a second check: at 1 in 40 the bubble should sit visibly but only slightly off centre, and a bubble that looks central means the fall is not there.

필요한 도구:

수평계수평계

재료

4

필요 도구

7
  • 플레이스홀더
  • 플레이스홀더
  • 플레이스홀더
  • 1 vendor sell this, none ship to you yet
    플레이스홀더
  • 플레이스홀더
  • 플레이스홀더
  • 플레이스홀더

관련 블루프린트

이 블루프린트들은 지식을 공유합니다 — 기술, 재료 또는 원리

CC0 퍼블릭 도메인

이 블루프린트는 CC0로 공개되었습니다. 어떤 목적으로든 자유롭게 복사, 수정, 배포 및 사용할 수 있습니다.

제품 구매를 통해 메이커를 지원하세요. 판매자가 설정한 메이커 커미션 을 받거나, 이 블루프린트의 새로운 반복을 만들어 연결로 포함시킬 수 있습니다.

토론

(0)

로그인 하여 토론에 참여하세요

댓글 로딩 중...