Build the pond and a one-way gate
Build the pond and a one-way gate
The gate is the whole trick and it needs no mechanism.
- Make a tank divided by a wall — one side is the pond, the other the sea.
- Cut an opening in the wall and hang a flap that swings only toward the pond.
- Raise the sea level and watch the flap open; lower it and watch it shut.
이 단계의 재료:
발트 자작나무 합판1 팩Measure the head and when you have it
Measure the head and when you have it
Available power depends on the difference between pond and sea, and that changes constantly.
- Fill the pond at high water and close the gate.
- Lower the outside level in steps to simulate the ebb, recording the head each time.
- Plot head against time through a simulated tide.
이 단계의 재료:
자1 개
스톱워치1 개Fit a wheel that tolerates low head
Fit a wheel that tolerates low head
The head is small and falling, so the wheel must suit that.
- Build an undershot or low-breastshot wheel in the outflow.
- Run water through and observe the speed as the head drops.
- Try a high overshot wheel and see it fail.
이 단계의 재료:
Ball Bearing - Flanged (6,35 mm Bore, 1,27 cm OD)2 개Estimate the energy stored
Estimate the energy stored
The pond is a battery, and you can size it.
- Measure the pond area and the usable head.
- Energy ≈ ρ × g × A × h² / 2 — the water's average fall is half the head.
- Divide by the working duration for average power.
History and context
History and context
The earliest excavated examples are remarkably old: Nendrum in Strangford Lough, Northern Ireland, has been dated by dendrochronology to the early seventh century, with an even earlier phase around 619. Tide mills then appear across Atlantic Europe — Brittany, Portugal, England, the Netherlands — and were carried to the American colonies, where several operated in New England.
They were commercially serious, not curiosities. Some ran into the twentieth century; the Eling tide mill in Hampshire still grinds. Their advantage was reliability of a kind rivers do not offer: a river fails in drought and floods in spate, while the tide simply arrives, forever, on a schedule known centuries in advance.
The scheduling cost was borne by people. Because high water shifts roughly fifty minutes later each day, a tide miller's working hours rotated through the whole clock over a fortnight, including the middle of the night. This is the oldest example of a workforce arranged around an intermittent renewable resource, and the arrangement was to make the humans flexible.
What it became: tidal barrage schemes — La Rance in France since 1966, Sihwa Lake in South Korea — are tide mills at national scale, with turbines instead of a wheel and often generating on both the flood and the ebb. The environmental objection is the same at both scales: a barrage changes the estuary it dams, and estuaries are among the most biologically productive places there are.
재료
4- 1 팩플레이스홀더
- 1 개플레이스홀더
- 1 개플레이스홀더
- ₩33
CC0 퍼블릭 도메인
이 블루프린트는 CC0로 공개되었습니다. 어떤 목적으로든 자유롭게 복사, 수정, 배포 및 사용할 수 있습니다.
제품 구매를 통해 메이커를 지원하세요. 판매자가 설정한 메이커 커미션 을 받거나, 이 블루프린트의 새로운 반복을 만들어 연결로 포함시킬 수 있습니다.