
Pneumatic Tube Post
ညွှန်ကြားချက်များ
Build the tube and a carrier
Build the tube and a carrier
The fit between carrier and bore is the whole engineering problem.
- Take a straight length of smooth tube.
- Make a carrier slightly smaller than the bore.
- Fit felt or foam rings at each end so it seals but still slides.
Materials for this step:
PVC Pipe (50 mm)1 length
Cork Sheet1 ရွက်Push, then pull
Push, then pull
Two ways to make the pressure difference, and they are not equivalent.
- Blow into one end with a vacuum cleaner on its blower port and watch the carrier travel.
- Now apply suction at the far end instead.
- Compare the speed and the smoothness.
Materials for this step:
Vacuum Pump - 12V1 ခုMeasure speed against pressure
Measure speed against pressure
Turn it into a measurement.
- Mark a measured run length on the tube.
- Time the carrier over that distance at several blower settings.
- Plot speed against setting.
Materials for this step:
Stopwatch1 ခု
Steel Ruler1 ခုSolve the arrival problem
Solve the arrival problem
A carrier arriving at 30 km/h has to be stopped without being destroyed.
- Send a carrier hard into a bare tube end and inspect the damage.
- Add a cushion of trapped air by restricting — not blocking — the exit.
- Repeat and compare.
History and context
History and context
London, 1853: the first commercial pneumatic despatch line ran a short distance between the Stock Exchange and the Electric Telegraph Company. The idea grew fast because it solved the last-leg problem of telegraphy — a telegram crossed the country in minutes and then waited for a boy with a bicycle.
Paris built the largest network in the world. The poste pneumatique eventually ran to hundreds of kilometres under the city, and a petit bleu — a message on blue paper — could cross Paris in well under an hour. It ran until 1984, outliving the telegram itself.
The scaled-up versions failed. London's Pneumatic Despatch Company built tubes large enough for parcel wagons in the 1860s, and Alfred Ely Beach demonstrated a pneumatic passenger subway under Broadway in 1870. Neither worked economically; sealing a large bore against leakage is very much harder than sealing a small one, and the power required scales badly. Small tubes for documents were the viable size, and remain so.
Still in daily use. Hospitals move blood samples and drugs through pneumatic tubes because a physical sample cannot be emailed, banks use them at drive-through windows, and large factories and supermarkets move cash. A technology that lost to the telephone for messages still wins for objects — and the modern hyperloop proposals are the same push-a-sealed-carrier-through-a-tube idea at a scale that has failed twice before.
ပစ္စည်းများ
5- 1 lengthPlaceholder
- 1 ရွက်Placeholder
- $14.00
- 1 ခုPlaceholder
CC0 အများပိုင်
ဤအစီအစဉ်ကို CC0 အောက်တွင် ထုတ်ဝေထားသည်။ ခွင့်ပြုချက်မလိုဘဲ ကူးယူ၊ ပြင်ဆင်၊ ဖြန့်ဝေ နှင့် အသုံးပြုနိုင်သည်။
အစီအစဉ်မှတစ်ဆင့် ကုန်ပစ္စည်းများဝယ်ယူ၍ ဖန်တီးသူကို ပံ့ပိုးပါ ဖန်တီးသူ ကော်မရှင် ရောင်းချသူက သတ်မှတ်သည်၊ သို့မဟုတ် ဤအစီအစဉ်၏ ဗားရှင်းအသစ်ဖန်တီး၍ ဝင်ငွေခွဲဝေရန် သင့်အစီအစဉ်တွင် ချိတ်ဆက်မှုအဖြစ် ထည့်သွင်းပါ။