Oil Storage Tank: a Riveted Steel Tank with Globe Roof (Bell, 1923)
An above-ground oil tank of riveted 'tank steel': a flat bottom, rings of plate lapped and riveted, angle irons at top and bottom, and a self-supporting globe roof. Every seam is caulked oil-tight and the tank is water-tested before painting.
Variable: capacity. Bell's Fig. 158 is 1,000 barrels: 20 ft inside diameter, about 20 ft 3 in high, four rings of 1/4 in plate, sixteen 3/16 in roof plates rising 3 ft. Standard tanks run from 500 to 80,000 barrels (120 ft x 40 ft).
Source: H. S. Bell, American Petroleum Refining (1923), pp. 286-306. Picture: Fig. 158 of the book.
Мэргэжилтэн
Unknown
Зааварчилгаа
1
1
Choose the size and plates
Choose the size and plates
Pick the capacity from the standard sizes (1,000 barrels: 20 ft diameter, 20 ft high). Take plate thickness from Bell's chart for the head and diameter, with a factor of safety of at least 2 1/2 for refinery tanks. Use at least 1/4 in for the shell; bottom 1/4 in on larger tanks, 3/16 in on smaller. Rings are 6 ft (72 in plates); about 7 ft is the limit.
Шаардлагатай багаж:
Тодорхойгүй хэмжээс2
2
Prepare the ground
Prepare the ground
Level the ground in a circle 10 ft wider than the tank and remove all vegetable growth. Avoid a mix of cut and fill. In old yards filled with cinders, dig them out at least 8 in deep and replace with fine gravel, loam or sand. On poor soil, use piles.
Энэ алхмын материал:
Хайрга1 as neededШаардлагатай багаж:
Тодорхойгүй хэмжээс3
3
Punch and scarf the plates
Punch and scarf the plates
Punch the rivet holes. For 1/4 in plate with 5/8 in rivets, a single lap seam has holes 2 1/4 in apart and 1 1/8 in from the edge; keep the clear space between holes no more than 6 or 7 times the plate thickness, or the caulked edge springs. Scarf the corner of the middle plate where three plates meet: cold up to 1/4 in, hot above, drawn to an edge no thicker than 1/16 in.
Шаардлагатай багаж:
Цоолох шахуурга
Том алх4
4
Build the bottom on horses
Build the bottom on horses
Lay, rivet and caulk the bottom on trestles or horses about 30 in high. Rivet the bottom angle iron (Fig. 158: 3 x 3 x 5/16 in) with a 1/4 in bent-plate shoe behind each angle splice; caulk the shell leg past the shoe at least 12 in, or better bevel and caulk the angle all round. Assemble and drive the first ring while the bottom is still up. Test the bottom under 6 to 8 in of water. Coat its underside with ship-bottom or heavy asphalt paint.
Энэ алхмын материал:
Зөөлөн ган хавтан1 bottom, first ring
Зөөлөн ганан өнцөгт төмөр1 bottom angle
Ган ривет1 ширхэг
Тодорхойгүй материал1 asphalt paintШаардлагатай багаж:
Ривет алх
Нүх тэлэгч
Ус
Өргөн будгийн бийр5
5
Lower it and raise the shell
Lower it and raise the shell
Raise the tank on jacks round the edge, clear out the horses and debris, and lower the bottom to grade. Rivet and caulk the remaining rings from scaffolds: floating scaffolds where water is at hand (water is pumped in as each ring is caulked tight, testing as you go), or brackets bolted through punched holes, later plugged with hot rivets. Where three plates meet, bolt them, heat cherry red with an oil-burning torch and lay the joint up with sledges before riveting. Fit the top angle (2 1/2 x 2 1/2 x 5/16 in) and a flanged steel manhole in the bottom ring.
Энэ алхмын материал:
Зөөлөн ган хавтан1 rings
Зөөлөн ганан өнцөгт төмөр1 top angle
Ган ривет1 ширхэгШаардлагатай багаж:
Шураг домкрат
Ривет алх
Нүх тэлэгч
Бамбар
Том алх
Ус6
6
Fit the globe roof
Fit the globe roof
For tanks up to 54 ft across, rivet on a self-supporting globe roof of segmental 3/16 in plates (Fig. 158: sixteen plates, 1/4 in centre plate, 3 ft rise); cold riveting is fine here. Make it gas-tight, with one vent at the apex covered by brass or monel wire cloth of at least 50 mesh.
Энэ алхмын материал:
Зөөлөн ган хавтан1 roof
Ган ривет1 ширхэгШаардлагатай багаж:
Ривет алх7
7
Test and paint
Test and paint
Fill the tank with water to test it before painting; it shows the important leaks, though not always tightness for light oils. Wire-brush off mill scale and rust. Give shell and roof three coats: one of red lead ground in boiled linseed oil, then two of good grey graphite paint.
Энэ алхмын материал:
Хар тугалганы улаан1 first coat
Буцалгасан маалингын тос1 ширхэг
Тодорхойгүй материал2 grey graphite paintШаардлагатай багаж:
Ус
Утсан сойзны багц
Өргөн будгийн бийрМатериал
7- 1 as neededТүр орлуулагч
- 1 roofТүр орлуулагч
- 1 top angleТүр орлуулагч
- 1 ширхэгТүр орлуулагч
- 2 grey graphite paintТүр орлуулагч
- 1 first coatТүр орлуулагч
- 1 ширхэгТүр орлуулагч
Шаардлагатай багаж
10- Түр орлуулагч
- Түр орлуулагч
- Түр орлуулагч
- Түр орлуулагч
- Түр орлуулагч
- Түр орлуулагч
- Түр орлуулагч
- Түр орлуулагч
- Түр орлуулагч
- Түр орлуулагч
Холбогдсон загварын материал

10% хамаарал
Mild Steel Plate and Sheet Hammered from a Billet
Forge зохиосон
Орчин үеийн
42
0
0
0
5
0

10% хамаарал
Hot-Rolled Steel Angles and Channels
Forge зохиосон
Металл боловсруулалт
27
0
0
0
2
0

10% хамаарал
Steel Rivets Forged in a Nail Header
Forge зохиосон
Дархан
32
0
0
0
1
0

Аюултай
10% хамаарал
Making Red Lead (Minium) — The Pigment That Named the Art of Miniature Painting
Charlie зохиосон
УРЛАГ
118
0
0
0
2
0
Энэ загвараар хийдэг
CC0 Нийтийн домэйн
Энэ загвар CC0 дор гаргагдсан. Та зөвшөөрөл авахгүйгээр хуулах, өөрчлөх, түгээх, ашиглах боломжтой.
Загвараар дамжуулан бүтээгдэхүүн худалдаж авч Бүтээгчийг дэмжээрэй Бүтээгчийн шимтгэл Борлуулагчаар тогтоосон, эсвэл энэ загварын шинэ хувилбар үүсгэж орлогоо хуваахын тулд өөрийн загварт холбоос болгон оруулна уу.