ARTE
BELLEZA Y BIENESTAR
ARTESANÍA
CULTURA E HISTORIA
ENTRETENIMIENTO
MEDIO AMBIENTE
COMIDA Y BEBIDAS
INGENIERÍA INVERSA
CIENCIAS
DEPORTES
TECNOLOGÍA
TECNOLOGÍA VESTIBLE
Setting a Gradient: Drainage Falls and the Boning Rod
Emma

Creado por

Emma

23. septiembre 2026SE
22
0
0
0
0

Setting a Gradient: Drainage Falls and the Boning Rod

The drainage tile, the septic tank and the constructed wetland already published here all share a requirement none of them explains: the pipe must fall at a specific, constant gradient, and both too little and too MUCH will stop it working. Too little and solids settle. Too much and the water runs away and leaves the solids behind — which surprises people, and is why a steep drain blocks as reliably as a flat one. The traditional figures, one in forty for a small foul drain and one in eighty for a larger one, are not arbitrary: they are the range where the flow stays fast enough to scour and slow enough to carry. Boning rods are how that gradient gets built without an instrument in the trench. Three T-shaped rods, two set on the known ends and one carried along, and your own eye does the interpolation.
Intermedio
1 day

Instrucciones

1

Fix the two ends before anything else

Establish the invert level — the inside bottom of the pipe — at the start and at the outfall, using the levelling method from earlier in this batch. The outfall is usually fixed by something you do not control: an existing manhole, a ditch, a soakaway. Level it FIRST and work backwards, because discovering at the end of the trench that you needed 300 millimetres you have not got is the failure this whole rung exists to prevent.

Materiales para este paso:

Clavijas de maderaClavijas de madera6 piezas

Herramientas necesarias:

Nivel óptico (topografía)Nivel óptico (topografía)
Mira de nivelaciónMira de nivelación
2

Choose the gradient, and check it against both limits

Work out the fall available over the run, and compare it with what the pipe needs. For a 100 mm foul drain, 1 in 40 is the usual figure; for 150 mm, 1 in 60 to 1 in 80. Check BOTH ends of the range. A gradient far steeper than needed is a real fault, not a safety margin, and where the ground falls faster than the pipe should, the answer is a steep section plus a manhole or a backdrop — not a uniformly steep pipe.
3

Make a set of boning rods

Make three identical T-shaped rods — a vertical leg with a horizontal crosspiece — all exactly the same length, with the crosspieces painted a colour that stands out against soil. Identical is the whole trick, and the only tolerance that matters is between the three: cut them together and check them against each other, not against a tape. If they differ by 10 millimetres, your trench is wrong by 10 millimetres everywhere, and nothing in the method will tell you.

Materiales para este paso:

Miras de rasanteMiras de rasante3 piezas
Viga de abeto de DouglasViga de abeto de Douglas2 length

Herramientas necesarias:

SerruchoSerrucho
Cinta métricaCinta métrica
4

Set sight rails at each end and bone between them

Set a sight rail at each end of the run, each one exactly one boning-rod height above the intended invert at that point. The line joining the two rail tops is then parallel to the pipe, one rod height up. Stand behind one rail and sight across both. Anyone in the trench holds the third rod on the formation: when its crosspiece lines up exactly with the two rails, the trench is at the right depth. Your eye is doing linear interpolation over thirty metres, to a few millimetres, with no instrument.

Materiales para este paso:

Viga de abeto de DouglasViga de abeto de Douglas4 length
Clavos galvanizadosClavos galvanizados20 piezas

Herramientas necesarias:

SerruchoSerrucho
Martillo de orejasMartillo de orejas
Nivel óptico (topografía)Nivel óptico (topografía)
5

Lay to the invert, not to the top of the pipe

Bed each pipe so that the INSIDE BOTTOM sits on the line, and check every single one before backfilling. Pipes vary in wall thickness, so laying to the top of the barrel puts a step in the invert at each joint — and a step is where solids catch. Support the barrel along its length, never on the collars, and never pack it up on a stone: a pipe bearing on two hard points cracks under backfill.

Herramientas necesarias:

Miras de rasanteMiras de rasante
Nivel de burbujaNivel de burbuja
6

Why too steep blocks a drain

Cargando el cuaderno de Jupyter…
7

Prove it with water before you backfill

Run a bucket of water down the finished pipe and watch it at the outfall. It should arrive promptly and completely, leaving nothing standing. Water is the only test that matters, it costs a bucket, and it is available exactly once — after backfilling, finding a reverse fall means digging the whole run out again. Put a spirit level in the trench along the pipe as a second check: at 1 in 40 the bubble should sit visibly but only slightly off centre, and a bubble that looks central means the fall is not there.

Herramientas necesarias:

Nivel de burbujaNivel de burbuja

Materiales

4

Herramientas requeridas

7

Blueprints relacionados

Estos blueprints comparten conocimiento — técnicas, materiales o principios

CC0 Dominio público

Este Blueprint se publica bajo CC0. Eres libre de copiar, modificar, distribuir y usar este trabajo para cualquier propósito, sin pedir permiso.

Apoya al Maker comprando productos a través de su Blueprint, donde gana una Comisión del Maker establecida por los vendedores, o crea una nueva iteración de este Blueprint e inclúyela como conexión en tu propio Blueprint para compartir ingresos.

Discusión

(0)

Iniciar sesión para unirte a la discusión

Cargando comentarios...