
Mica Collection Jharkhand — Extracting Muscovite Mica Sheets from Mines
Traditional method of collecting muscovite mica from the mica belt of Jharkhand and Bihar. India produces approximately 60% of the world's sheet mica, with the Koderma-Giridih-Hazaribagh belt being the most prominent. Mica is found in pegmatite rocks which are formed from granite. This blueprint covers the identification of mica-rich veins, surface collection, extraction from shallow mines, dividing books into sheets, cleaning, classification by size, quality inspection, and packaging.
Arahan
Understanding the Mica Mineral
Understanding the Mica Mineral
Identifying Pegmatite Veins
Identifying Pegmatite Veins
Bahan untuk langkah ini:
Geological Survey Map (Koderma-Giridih region)1 setAlatan diperlukan:
Geological HammerSite Survey and Preparation for Mining
Site Survey and Preparation for Mining
Bahan untuk langkah ini:
Tarpaulin Sheet (3m x 3m)1 kepingAlatan diperlukan:
Machete
Measuring Tape (30m)
Notebook and PencilSurface Collection
Surface Collection
Bahan untuk langkah ini:
Bamboo Collection Basket2 kepingAlatan diperlukan:
Pickaxe (small)
Hand TrowelExtracting Mica from a Shallow Mine
Extracting Mica from a Shallow Mine
Alatan diperlukan:
Cold Chisel (flat, 25mm)
Cold Chisel (pointed)
Sledgehammer (3 kg)
Hand Hammer (1 kg)
Safety GogglesFreeing Mica Books from the Rock
Freeing Mica Books from the Rock
Bahan untuk langkah ini:
Jute Sack2 keping
Cotton Cloth Sheet1 kepingAlatan diperlukan:
Thin Flat Chisel (10mm)
Hand Hammer (500g)Splitting Books into Sheets
Splitting Books into Sheets
Alatan diperlukan:
Splitting Knife (thin blade)
Sewing Needle (large)
Flat Work TableCleaning the Mica Sheets
Cleaning the Mica Sheets
Bahan untuk langkah ini:
Distilled Water (1 Liter)5 liter
Soft Cotton Cloth2 kepingAlatan diperlukan:
Soft Bristle Brush
Tin Snips (straight blade)Trimming — Cutting Sheets to Shape
Trimming — Cutting Sheets to Shape
Alatan diperlukan:
Tin Snips (straight blade)
Steel Ruler (30cm)
Flat Work TableSize Grading
Size Grading
Alatan diperlukan:
Steel Ruler (30cm)
Grading Template (cardboard cutouts)Quality Inspection
Quality Inspection
Alatan diperlukan:
Light Box (inspection)Weighing and Record-Keeping
Weighing and Record-Keeping
Bahan untuk langkah ini:
Record Notebook1 kepingAlatan diperlukan:
Weighing Scale (digital, 0-50 kg)Packaging and Storage
Packaging and Storage
Bahan untuk langkah ini:
Tissue Paper (acid-free)50 helaian
Corrugated Cardboard Sheet10 keping
Cotton Binding Strip5 meter
Wooden Packing Crate1 keping
Newspaper (padding)2 kgSafety Precautions and Environmental Protection
Safety Precautions and Environmental Protection
Bahan untuk langkah ini:
Safety Goggles1 keping
Hard Hat1 kepingBahan
18- Pemegang Tempat
- 1 kepingPemegang Tempat
- 2 kepingPemegang Tempat
- 2 kepingPemegang Tempat
- 1 kepingPemegang Tempat
- 5 literPemegang Tempat
- 2 kepingPemegang Tempat
- 1 kepingPemegang Tempat
- 50 helaianPemegang Tempat
- Pemegang Tempat
- 5 meterPemegang Tempat
- 1 kepingPemegang Tempat
- Pemegang Tempat
- 1 kepingPemegang Tempat
Alatan Diperlukan
24- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
CC0 Domain Awam
Blueprint ini dikeluarkan di bawah CC0. Anda bebas menyalin, mengubah, mengedar, dan menggunakan karya ini untuk sebarang tujuan, tanpa meminta kebenaran.
Sokong Pembuat dengan membeli produk melalui Blueprint mereka di mana mereka memperoleh Komisen Pembuat ditetapkan oleh Penjual, atau cipta iterasi baru Blueprint ini dan sertakan ia sebagai sambungan dalam Blueprint anda sendiri untuk berkongsi hasil.