SENI
KECANTIKAN & KESEJAHTERAAN
KRAFTANGAN
BUDAYA & SEJARAH
HIBURAN
ALAM SEKITAR
MAKANAN & MINUMAN
KEJURUTERAAN TERBALIK
SAINS
SUKAN
TEKNOLOGI
BOLEH PAKAI
Elm Boards, Milled and Air-Dried
Woody

Dicipta oleh

Woody

17. Oktober 2026NO
6
0
0
0
0

Elm Boards, Milled and Air-Dried

Elm has interlocking grain that resists splitting, which is why wagon-wheel hubs were made of it. Mill and dry it as the oak boards: mill the log, seal the ends the same day, sticker the boards in the shade and let a moisture meter say when they are dry. Elm distorts easily, so weight the stack well. The picture: our diagram of the stickered stack.
Pertengahan
1 day milling, then months to years drying

Arahan

1

The milling and drying method

Milling, end-sealing, stickering and reading the moisture, as for oak.
2

Mill the boards

Mill the elm log into boards a few millimetres over 50 mm thick, thick enough for a wheel hub.

Bahan untuk langkah ini:

Keratan balak kayu elmKeratan balak kayu elm1 keping
Skru kayuSkru kayu6 keping

Alatan diperlukan:

Gergaji mesin (gred perhutanan profesional)Gergaji mesin (gred perhutanan profesional)
Rangka belah gergaji mesinRangka belah gergaji mesin
Papan painPapan pain
Gerudi Tanpa WayarGerudi Tanpa Wayar
Pembaris lurusPembaris lurus
Aras CecairAras Cecair
Topi keledar keselamatanTopi keledar keselamatan
Penutup telinga pelindungPenutup telinga pelindung
Sarung Tangan Kerja KulitSarung Tangan Kerja Kulit
But keselamatan berhujung keluliBut keselamatan berhujung keluli
3

Seal the ends

Coat both ends of every board with wax end sealer the same day.

Bahan untuk langkah ini:

Pengedap hujung (lilin parafin)Pengedap hujung (lilin parafin)0.3 liter
4

Sticker, cover and wait

Stack level, 30 cm off the ground, with stickers every 30 cm one above the other, in a shaded airy place. Cover the top and weight the stack heavily: elm distorts easily.

Bahan untuk langkah ini:

Sesendal kayu (penyendal pengeringan)Sesendal kayu (penyendal pengeringan)30 keping

Alatan diperlukan:

Palet kayuPalet kayu
Aras CecairAras Cecair
TerpalTerpal
5

Read the moisture

Read a board from the middle each season. When it reaches 12–15 %, bring the boards indoors to settle before joinery.

Alatan diperlukan:

Meter lembapanMeter lembapan

Bahan

4

Alatan Diperlukan

13

CC0 Domain Awam

Blueprint ini dikeluarkan di bawah CC0. Anda bebas menyalin, mengubah, mengedar, dan menggunakan karya ini untuk sebarang tujuan, tanpa meminta kebenaran.

Sokong Pembuat dengan membeli produk melalui Blueprint mereka di mana mereka memperoleh Komisen Pembuat ditetapkan oleh Penjual, atau cipta iterasi baru Blueprint ini dan sertakan ia sebagai sambungan dalam Blueprint anda sendiri untuk berkongsi hasil.

Perbincangan

(0)

Log masuk untuk menyertai perbincangan

Memuatkan komen...