Kerjasama
SENI
KECANTIKAN & KESEJAHTERAAN
KRAFTANGAN
BUDAYA & SEJARAH
HIBURAN
ALAM SEKITAR
MAKANAN & MINUMAN
KEJURUTERAAN TERBALIK
SAINS
SUKAN
TEKNOLOGI
BOLEH PAKAI

Ferrite Toroid Core: Wet-Process Copper-Zinc Ferrite with a Stepped Anneal Down to 310 °C (Snoek 1948)
The wet-process copper-zinc ferrite ring of Snoek's Example II, given a long stepped anneal in oxygen after its 600 °C hold: 19 hours at 510 °C, 34 hours at 410 °C and 12 hours at 310 °C. The initial permeability fell from 500 to 410.
Source: J. L. Snoek, US 2,452,529 (Philips, 1948), Example II, wet process. Picture: our diagram.
Lanjutan
3 days
Arahan
1
1
Dissolve the copper, zinc and iron salts
Dissolve the copper, zinc and iron salts
Make 1 litre of a purified solution of 0.2 mol copper sulphate, 0.3 mol zinc sulphate and 1 mol iron nitrate. Ours: 49.94 g copper sulphate pentahydrate; weigh the zinc sulphate and ferric nitrate for the hydrate you have.
Bahan untuk langkah ini:
Kuprum sulfat pentahidrat (CuSO4·5H2O)49.94 g
Zink sulfat0.3 mol
Ferik Nitrat1 mol
Air Suling1 lAlatan diperlukan:
Neraca dua piring
Bikar Borosilikat
Sarung tangan getah2
2
Precipitate hot with 9 M caustic soda
Precipitate hot with 9 M caustic soda
Heat the solution and precipitate it with 0.5 litre of 9 molar caustic soda. Ours: 180 g sodium hydroxide in water to 0.5 litre. Strong alkali: goggles and gloves.
Bahan untuk langkah ini:
Natrium Hidroksida — Gred Makmal180 gAlatan diperlukan:
Bikar Borosilikat
Plat Pemanas
Gogal Percikan Kimia
Sarung tangan getah3
3
Wash, dry and pre-heat at 700 °C
Wash, dry and pre-heat at 700 °C
Wash out the deposit, dry it, and pre-heat it at 700 °C so it moulds better.
Alatan diperlukan:
Kertas Turas
Air Suling
Ketuhar pengeringan
Relau Tiub
Mangkuk pijar bertutup (porselin)
Sarung Tangan Tahan Haba4
4
Mould a ring at 4 tons per cm²
Mould a ring at 4 tons per cm²
Mould the powder at 4 tons per square centimetre into a ring 3 cm across with a 4 × 4 mm section.
Alatan diperlukan:
Mesin tekan hidraulik
Acuan Penekan Gelang
Topeng Habuk5
5
Heat 3 hours at 900 °C, cool to 600 °C, hold 30 hours
Heat 3 hours at 900 °C, cool to 600 °C, hold 30 hours
Heat the ring for about 3 hours at 900 °C, cool it to 600 °C at 5 °C per minute, hold it there for 30 hours and let it cool to room temperature, all in a current of oxygen. Snoek's core: initial permeability 500.
Alatan diperlukan:
Relau Tiub
Oksigen
Silinder gas bertekanan
Pirometer
Penyepit Mangkuk Pijar
Sarung Tangan Tahan Haba6
6
Anneal 19 h at 510 °C, 34 h at 410 °C, 12 h at 310 °C
Anneal 19 h at 510 °C, 34 h at 410 °C, 12 h at 310 °C
After the 600 °C hold, keep the core for another 19 hours at 510 °C, 34 hours at 410 °C and 12 hours at 310 °C, all in oxygen. Snoek's core: initial permeability 410.
Alatan diperlukan:
Relau Tiub
Oksigen
Silinder gas bertekanan
Pirometer
Penyepit Mangkuk Pijar
Sarung Tangan Tahan HabaBahan
5- Pemegang Tempat
- 0.3 molPemegang Tempat
- 1 molPemegang Tempat
- 1 lPemegang Tempat
- Pemegang Tempat
Alatan Diperlukan
18- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
- Pemegang Tempat
Blueprint ini membuat
Blueprint berkaitan
Blueprint ini berkongsi pengetahuan — teknik, bahan atau prinsip
CC0 Domain Awam
Blueprint ini dikeluarkan di bawah CC0. Anda bebas menyalin, mengubah, mengedar, dan menggunakan karya ini untuk sebarang tujuan, tanpa meminta kebenaran.
Sokong Pembuat dengan membeli produk melalui Blueprint mereka di mana mereka memperoleh Komisen Pembuat ditetapkan oleh Penjual, atau cipta iterasi baru Blueprint ini dan sertakan ia sebagai sambungan dalam Blueprint anda sendiri untuk berkongsi hasil.

