Ore Jig: a Power-Driven Movable-Sieve (Cornish) Jig at Mill 12 (Richards, 1903)
Forge

Dicipta oleh

Forge

4. November 2026NO
6
0
0
0
0

Ore Jig: a Power-Driven Movable-Sieve (Cornish) Jig at Mill 12 (Richards, 1903)

An ore jig sorts crushed ore by weight: a box with a screen bottom is jerked up and down in a tank of water, so the heavy mineral settles to the bottom of the bed and the light rock stays on top to be skimmed off. Robert H. Richards' Ore Dressing (1903) gives the sizes of the movable-sieve Cornish jigs at his Mill 12: a box of 1-inch boards 22 by 46 inches with a 5-mesh screen, worked by a lever and an eccentric in a tank 7 feet deep, with 6-minute jigging charges skimmed by hand. He does not say what the tank, lever and eccentric are made of; those are Unknown here. Source: R. H. Richards, Ore Dressing vol. I (1903), § 383, p. 506. Picture: his Figs. 300a-300d, the hand jig at Mill 2.
Pertengahan
Several days to build

Arahan

1

Read Richards

"These differ from the continuous, movable sieve jigs in that the feeders, the hydraulic water, the discharges for coarse concentrates, hutches and tailings, are all left out. They are practically hand jigs adapted to power."
2

Build the jigging box

Make the jigging box of 1-inch boards, 22 inches wide and 46 inches long, with a 5-mesh screen across it so that the box stands 7 inches deep above the screen and 3 inches below it.

Bahan untuk langkah ini:

Papan kayuPapan kayu1 1-inch boards
Penapis jaring kasarPenapis jaring kasar1 5-mesh

Alatan diperlukan:

Gergaji tukang kayuGergaji tukang kayu
TukulTukul
Pita UkurPita Ukur
3

Hang it in the tank on a lever

Set up a tank 30 inches wide, 54 inches long and 7 feet deep, full of water. Hang the box in it from a jigging lever with a long arm of 4 feet 2 inches and a short arm of 10 inches, the box on the short arm, as in the hand jig of Figs. 300a-300c. Drive the long arm from an eccentric with a 5-inch throw, which gives the box a 1-inch stroke. Put a hitching post beside the jig to hold the sieve up out of the water. The materials of the tank, lever, eccentric and post are not given (unknown).

Bahan untuk langkah ini:

Bahan tidak diketahuiBahan tidak diketahui1 tank, lever, eccentric, hitching post

Alatan diperlukan:

Gergaji tukang kayuGergaji tukang kayu
TukulTukul
Pita UkurPita Ukur
4

Jig a charge

Feed ore crushed to 2 mesh and finer. Shovel it into the jigging box until the bed is 8 inches deep, connect the lever to the power and jig for 6 minutes. Then disconnect it, lift the sieve out of the water and hitch it to the post.

Alatan diperlukan:

PenyodokPenyodok
5

Skim by hand

Skim the bed off in layers: the top skimmings are waste, the middlings go back to be jigged again, and the coarse concentrates at the bottom go to the smelter. What falls through the screen (the hutch) is left to collect in the tank and finally shoveled out for the next, finer jigs.

Alatan diperlukan:

PenyodokPenyodok
6

History and honest limits

Richards was professor of mining engineering and metallurgy at the Massachusetts Institute of Technology. At Mill 12 four such jigs worked as No. 1 jigs, followed by two No. 2 and nine No. 3 jigs like them; at the Hartman mine in Pennsylvania a similar jig was worked on a 1-inch bed of coarse limestone tailings, adding 2-inch layers of ore. He gives the sizes of the box, lever, eccentric and tank, but not their materials (except the 1-inch boards) or the fastenings; the tools are ours.

Bahan

3

Alatan Diperlukan

4
  • Pemegang Tempat
  • Pemegang Tempat
  • 1 vendor sell this, none ship to you yet
    Pemegang Tempat
  • Pemegang Tempat

Blueprint ini membuat

CC0 Domain Awam

Blueprint ini dikeluarkan di bawah CC0. Anda bebas menyalin, mengubah, mengedar, dan menggunakan karya ini untuk sebarang tujuan, tanpa meminta kebenaran.

Sokong Pembuat dengan membeli produk melalui Blueprint mereka di mana mereka memperoleh Komisen Pembuat ditetapkan oleh Penjual, atau cipta iterasi baru Blueprint ini dan sertakan ia sebagai sambungan dalam Blueprint anda sendiri untuk berkongsi hasil.

Perbincangan

(0)

Log masuk untuk menyertai perbincangan

Memuatkan komen...