SINING
BEAUTY AT WELLNESS
CRAFTS
KULTURA AT KASAYSAYAN
LIBANGAN
KAPALIGIRAN
PAGKAIN AT INUMIN
REVERSE ENGINEERING
AGHAM
ISPORTS
TEKNOLOHIYA
MGA WEARABLE
Bismuth: Sweated Out of Native Ore in Inclined Iron Tubes, the Schneeberg Way (Thorpe, 1912)
Charlie

Nilikha ni

Charlie

4. Nobyembre 2026DE
2
0
0
0
0

Bismuth: Sweated Out of Native Ore in Inclined Iron Tubes, the Schneeberg Way (Thorpe, 1912)

The old way of getting bismuth from ore that holds it as the metal: heat the lumps just enough in sloping iron tubes and the bismuth, which melts easily, runs out of the rock into pots under charcoal. It takes 30-60 minutes a charge but gets only about two-thirds of the metal. Not given: the furnace temperature. Source: E. Thorpe, Dictionary of Applied Chemistry vol. I (1912), Bismuth, p. 458. Picture: Thorpe's Fig. 1, the furnace in plan.
Katamtaman
30-60 minutes per charge

Mga Tagubilin

1

Pick and break the ore

Sort the ore (7-12 % bismuth) by hand from the waste rock as far as possible and break it into pieces the size of a hazel nut.

Mga materyales para sa hakbang na ito:

Likas na mineral ng bismuthLikas na mineral ng bismuth1 12 cwt per tube charge

Mga kailangang kasangkapan:

MartilyoMartilyo
Timbangang pandaraanTimbangang pandaraan
2

Charge the tubes

Load about 12 cwt into each inclined iron tube of the furnace, leaving room to stir from the upper end. Close the upper ends with iron plates and the lower ends with plates pierced with round holes. Under each lower end stand an iron pot holding powdered charcoal, kept gently warm by a small charcoal fire.

Mga materyales para sa hakbang na ito:

UlingUling1 powdered, in the pots and for the pot fire

Mga kailangang kasangkapan:

Pugon sa pagtunaw at paghiwalay ng bismuthPugon sa pagtunaw at paghiwalay ng bismuth
Krisol na bakalKrisol na bakal
3

Sweat out the bismuth

Fire the furnace with wood so that the metal flows easily. In about 10 minutes the bismuth begins to run into the pots, where the charcoal covers it from the air. Stir the ore now and then with an iron rod from the upper end; in 30-60 minutes the charge is done. 20 cwt of ore burns about 63 cubic feet of wood.

Mga materyales para sa hakbang na ito:

PanggatongPanggatong1 about 63 cu ft per 20 cwt of ore

Mga kailangang kasangkapan:

Pugon sa pagtunaw at paghiwalay ng bismuthPugon sa pagtunaw at paghiwalay ng bismuth
Bilog na baras na bakalBilog na baras na bakal
4

Rake out and recharge

Rake the spent ore (bismuth barley) out of the upper end into the tank and refill at once with fresh ore.

Mga kailangang kasangkapan:

Kalaykay na bakalKalaykay na bakal
Pugon sa pagtunaw at paghiwalay ng bismuthPugon sa pagtunaw at paghiwalay ng bismuth
5

Cast ingots

Ladle the bismuth from the pots into moulds and cast ingots of 25-50 lb.

Mga kailangang kasangkapan:

Krisol na bakalKrisol na bakal
Sandok ng pagbububo ng metalSandok ng pagbububo ng metal
Hulmahan ng lingoteHulmahan ng lingote

Mga Materyales

3
  • 1 12 cwt per tube charge
    Placeholder
  • 1 powdered, in the pots and for the pot fire
    Placeholder
  • 1 about 63 cu ft per 20 cwt of ore
    Placeholder

Mga Kinakailangang Kasangkapan

8

Ang blueprint na ito ay gumagawa ng

CC0 Pampublikong Domain

Ang blueprint na ito ay inilabas sa ilalim ng CC0. Malaya kang kumopya, magbago, mamahagi, at gumamit nang walang pahintulot.

Suportahan ang Maker sa pamamagitan ng pagbili ng mga produkto sa kanilang Blueprint Komisyon ng Maker itinakda ng mga Vendor, o lumikha ng bagong bersyon ng Blueprint na ito at isama bilang koneksyon sa iyong Blueprint upang ibahagi ang kita.

Talakayan

(0)

Mag-login upang sumali sa talakayan

Naglo-load ng mga komento...