Pakikipagtulungan
SINING
BEAUTY AT WELLNESS
CRAFTS
KULTURA AT KASAYSAYAN
LIBANGAN
KAPALIGIRAN
PAGKAIN AT INUMIN
REVERSE ENGINEERING
AGHAM
ISPORTS
TEKNOLOHIYA
MGA WEARABLE
Heat Exchanger: the Double-Pipe Residual Exchanger (Bell, 1923)
Forge

Nilikha ni

Forge

4. Nobyembre 2026NO
3
0
0
0
0

Heat Exchanger: the Double-Pipe Residual Exchanger (Bell, 1923)

A heat exchanger built from stock pipe: runs of one pipe inside another, joined by return bends. Hot residuum from the stills flows one way in the outer pipe while cold crude flows the other way in the inner one, so the crude reaches the stills already warm. Variable: 2 in within 3 in, or 3 in within 4 in, and the number of runs (Bell's Fig. 73 has 16). Expect a transfer rate of 14 to 18 B.t.u. Source: H. S. Bell, American Petroleum Refining (1923), pp. 156-162. Unknown: run length, packing. Picture: Fig. 73 of the book.
Abantado
Unknown

Mga Tagubilin

1

Choose the pipe pair

Use 2 in pipe inside 3 in, or 3 in inside 4 in. Plan the number of runs (Fig. 73: 16 runs of 2 in in 3 in). Not given: run length.

Mga kailangang kasangkapan:

Hindi alam na sukatHindi alam na sukat
2

Put up the supports

Stand up channel-iron supports and bolt the runs to them, stacked so the bends line up at each end (Fig. 73).

Mga materyales para sa hakbang na ito:

Seksiyong asero na hugis USeksiyong asero na hugis U1 supports
Turnilyong anim-anggulo - uri 8.8Turnilyong anim-anggulo - uri 8.81 piraso

Mga kailangang kasangkapan:

Liyabe sa tuboLiyabe sa tubo
3

Assemble the runs

Slide each inner pipe into its outer pipe. At one end join the outer pipes with 3 in return bends whose stuffing boxes the 2 in pipe passes through; make the boxes extra deep, because hot oil penetrates. Join the inner pipes with 2 in return bends with unions. Use heavy fittings; steel ones on the first runs where the oil is 460 °F or hotter.

Mga materyales para sa hakbang na ito:

Tubong bakal (makapal ang dingding, may sinulid na dulo)Tubong bakal (makapal ang dingding, may sinulid na dulo)1 2 in and 3 in runs
Kasukasuan ng tubong may sinulidKasukasuan ng tubong may sinulid1 return bends, unions, stuffing boxes
Hindi alam na packingHindi alam na packing1 stuffing boxes

Mga kailangang kasangkapan:

Liyabe sa tuboLiyabe sa tubo
4

Connect the headers

Run counter-current: hot residuum from the stills enters the outer pipes from a 3 in header and leaves cold to storage by another; cold oil from storage enters the inner pipes from a 2 in header and leaves hot to the stills. Valve the headers.

Mga materyales para sa hakbang na ito:

Tubong bakal (makapal ang dingding, may sinulid na dulo)Tubong bakal (makapal ang dingding, may sinulid na dulo)1 headers
Balbulang pintoBalbulang pinto2 piraso

Mga kailangang kasangkapan:

Liyabe sa tuboLiyabe sa tubo

Mga Materyales

6

Mga Kinakailangang Kasangkapan

2

Ang blueprint na ito ay gumagawa ng

CC0 Pampublikong Domain

Ang blueprint na ito ay inilabas sa ilalim ng CC0. Malaya kang kumopya, magbago, mamahagi, at gumamit nang walang pahintulot.

Suportahan ang Maker sa pamamagitan ng pagbili ng mga produkto sa kanilang Blueprint Komisyon ng Maker itinakda ng mga Vendor, o lumikha ng bagong bersyon ng Blueprint na ito at isama bilang koneksyon sa iyong Blueprint upang ibahagi ang kita.

Talakayan

(0)

Mag-login upang sumali sa talakayan

Naglo-load ng mga komento...