Ubufatanye
UBUHANZI
UBWIZA N'UBUZIMA
UBUKORIKORI
UMUCO N'AMATEKA
IMYIDAGADURO
IBIDUKIKIJE
IBIRIBWA N'IBINYOBWA
UBWUBATSI BUSUBIRA INYUMA
UBUMENYI
SIPORO
IKORANABUHANGA
IBYAMBARWA

English
Ferrite Toroid Core: Wet-Process Copper-Zinc Ferrite with a Stepped Anneal Down to 310 °C (Snoek 1948)
The wet-process copper-zinc ferrite ring of Snoek's Example II, given a long stepped anneal in oxygen after its 600 °C hold: 19 hours at 510 °C, 34 hours at 410 °C and 12 hours at 310 °C. The initial permeability fell from 500 to 410.
Source: J. L. Snoek, US 2,452,529 (Philips, 1948), Example II, wet process. Picture: our diagram.
Hejuru
3 days
Amabwiriza
1
1
Dissolve the copper, zinc and iron salts
Dissolve the copper, zinc and iron salts
Make 1 litre of a purified solution of 0.2 mol copper sulphate, 0.3 mol zinc sulphate and 1 mol iron nitrate. Ours: 49.94 g copper sulphate pentahydrate; weigh the zinc sulphate and ferric nitrate for the hydrate you have.
Ibikoresho by'iyi ntambwe:
Sulufate y'umuringa ifite amazi atanu (CuSO4·5H2O)49.94 g
Sulfate ya zinc0.3 mol
Nitrate y'icyuma (III)1 mol
Amazi Yatunganyijwe1 lIbikoresho bikenewe:
Umunzani w'ibiro
Igikombe cya Borosilikate
Uturindantoki tw'ikawusu2
2
Precipitate hot with 9 M caustic soda
Precipitate hot with 9 M caustic soda
Heat the solution and precipitate it with 0.5 litre of 9 molar caustic soda. Ours: 180 g sodium hydroxide in water to 0.5 litre. Strong alkali: goggles and gloves.
Ibikoresho by'iyi ntambwe:
Hidorogisidi ya sodiyumu — urwego rw'ubushakashatsi180 gIbikoresho bikenewe:
Igikombe cya Borosilikate
Urubaho rushyushya
Amadarubindi yo Kwirinda Ibinyabutabire
Uturindantoki tw'ikawusu3
3
Wash, dry and pre-heat at 700 °C
Wash, dry and pre-heat at 700 °C
Wash out the deposit, dry it, and pre-heat it at 700 °C so it moulds better.
Ibikoresho bikenewe:
Urupapuro rwo Kuyungurura
Amazi Yatunganyijwe
Ifuru yo kumishaho
Itanura ry'umuyoboro
Ikirundo cyo gushongeramo gifite igifuniko (porukorene)
Uturindantoki twihanganira ubushyuhe4
4
Mould a ring at 4 tons per cm²
Mould a ring at 4 tons per cm²
Mould the powder at 4 tons per square centimetre into a ring 3 cm across with a 4 × 4 mm section.
Ibikoresho bikenewe:
Imashini ikanda ikoresha amazi
Ibumbano ryo gukanda impeta
Agapfukamunwa k'Umukungugu5
5
Heat 3 hours at 900 °C, cool to 600 °C, hold 30 hours
Heat 3 hours at 900 °C, cool to 600 °C, hold 30 hours
Heat the ring for about 3 hours at 900 °C, cool it to 600 °C at 5 °C per minute, hold it there for 30 hours and let it cool to room temperature, all in a current of oxygen. Snoek's core: initial permeability 500.
Ibikoresho bikenewe:
Itanura ry'umuyoboro
Ogisijene
Ibariro rya gazi ifite igitutu
Pirometero
Amakoro y'Icyombo Gishongesha
Uturindantoki twihanganira ubushyuhe6
6
Anneal 19 h at 510 °C, 34 h at 410 °C, 12 h at 310 °C
Anneal 19 h at 510 °C, 34 h at 410 °C, 12 h at 310 °C
After the 600 °C hold, keep the core for another 19 hours at 510 °C, 34 hours at 410 °C and 12 hours at 310 °C, all in oxygen. Snoek's core: initial permeability 410.
Ibikoresho bikenewe:
Itanura ry'umuyoboro
Ogisijene
Ibariro rya gazi ifite igitutu
Pirometero
Amakoro y'Icyombo Gishongesha
Uturindantoki twihanganira ubushyuheIbikoresho
5- Umwanya
- 0.3 molUmwanya
- Umwanya
- Umwanya
Ibikoresho bikenewe
18- Umwanya
- Umwanya
- Umwanya
- Umwanya
- Umwanya
- Umwanya
- Umwanya
- Umwanya
- Umwanya
- Umwanya
- Umwanya
- Umwanya
Iki gishushanyo gikora
Blueprint zijyanye
Izi blueprint zisangira ubumenyi — uburyo, ibikoresho cyangwa amahame
CC0 Umurenge rusange
Iyi blueprint yasohowe munsi ya CC0. Ushobora gukoporora, guhindura, gukwirakwiza no gukoresha nta kwemererwa.
Shyigikira Umuremyi ugura ibicuruzwa binyuze muri Blueprint ye Komisiyo y'Umuremyi byashyizweho n'Abacuruzi, cyangwa kora verisiyo nshya y'iyi Blueprint ukayinjiza nk'isano muri Blueprint yawe kugira ngo musangire inyungu.

