Ubufatanye
UBUHANZI
UBWIZA N'UBUZIMA
UBUKORIKORI
UMUCO N'AMATEKA
IMYIDAGADURO
IBIDUKIKIJE
IBIRIBWA N'IBINYOBWA
UBWUBATSI BUSUBIRA INYUMA
UBUMENYI
SIPORO
IKORANABUHANGA
IBYAMBARWA
Hydraulic Test Pump: Brass Valve Box with Glass Marble Valves and a Gas-Barrel Plunger (Cassell's, 1903)
Forge

Yaremwe na

Forge

9. Ugushyingo 2026NO
1
0
0
0
0

Hydraulic Test Pump: Brass Valve Box with Glass Marble Valves and a Gas-Barrel Plunger (Cassell's, 1903)

A hand pump for testing a small boiler, a pipe or a fitting with water under pressure. Cassell's Cyclopaedia of Mechanics (1903) drills a brass rod into a valve box, uses two glass playing marbles as the valves, and works a plunger in a short length of gas or steam pipe through a gland made from an ordinary socket and nipple. The source says it "would stand a pressure of 250 lb. per square inch easily". It has no gauge of its own: read the pressure on the work being tested. Source: P. N. Hasluck (ed.), Cassell's Cyclopaedia of Mechanics, Third Series (1903), p. 291, "Simple Hydraulic Testing Pump". Picture: its Figs. 1-3.
Hagati
Unknown

Amabwiriza

1

Read Cassell's

"The pump here illustrated is designed for use in testing a small boiler, and for similar purposes; it will fulfil the purpose of pumps of costly design and workmanship, and can be built for a few pence. It consists of a rod of solid brass or gun-metal drilled out to the required sizes as shown in Fig. 1, and fitted with ordinary iron gas or steam bends at the top and bottom of valve box."
2

Drill the valve box

Drill a rod of solid brass (or gun-metal) lengthwise from both ends to the sizes in Fig. 1, so that each glass marble drops into a seating made by the drill: the suction valve below, the discharge valve above. Drill and tap both ends for the iron gas or steam pipe bends, and drill and tap the centre of the side to take the pump barrel. No sizes are given (unknown).

Ibikoresho by'iyi ntambwe:

Umurongo w'Umuringa w'UmuhondoUmurongo w'Umuringa w'Umuhondo1 valve box

Ibikoresho bikenewe:

Ifatiro ry'AmezaIfatiro ry'Ameza
Icyuma Cyivumbura GihagazeIcyuma Cyivumbura Gihagaze
Ibyuma Byinshi byo GucukuraIbyuma Byinshi byo Gucukura
Agakoresho ko gukata imizingo y'ibyumaAgakoresho ko gukata imizingo y'ibyuma
Ingano zitazwiIngano zitazwi
3

Fit the valves and bends

Drop a glass marble into each seating (glass is preferred: it is far rounder than clay marbles). Screw an iron gas or steam pipe bend into the bottom (the suction) and another into the top (the delivery). The upper pipe carries a small cross-bar that stops the discharge marble from blocking the outlet (Fig. 3); its material is not given (unknown).

Ibikoresho by'iyi ntambwe:

Amabuye y'ibirahureAmabuye y'ibirahure2 ibice
Igihuza cy'umuyoboro gifite imiryaIgihuza cy'umuyoboro gifite imirya2 pipe bends
Ibikoresho bitazwiIbikoresho bitazwi1 cross-bar

Ibikoresho bikenewe:

Igifashi cy'imiyoboroIgifashi cy'imiyoboro
4

Make the barrel and gland

Cut a short length of gas or steam pipe for the barrel: its length is set by the stroke the pump is to have. Screw one end into the valve box. Countersink the other (gland) end, screw an ordinary socket over it, and screw into the socket an ordinary nipple, also countersunk, as the gland. Fit a back nut on the nipple for screwing up the gland and fix it with a rivet so it cannot turn.

Ibikoresho by'iyi ntambwe:

Umuyoboro w'AmaziUmuyoboro w'Amazi1 short length
Igihuza cy'umuyoboro gifite imiryaIgihuza cy'umuyoboro gifite imirya2 socket and nipple
Ecrou ifungaEcrou ifunga1 igice
Ibyuma byo guhambiraIbyuma byo guhambira1 igice

Ibikoresho bikenewe:

Umucumita w'IbyumaUmucumita w'Ibyuma
Urutonde rw'ibikoresho byo kwagura utwoboUrutonde rw'ibikoresho byo kwagura utwobo
Igifashi cy'imiyoboroIgifashi cy'imiyoboro
Inyundo ifite umutwe wa burutaInyundo ifite umutwe wa buruta
5

Make the plunger

File out the inside of the barrel roughly to remove scale and unevenness left by the pipe mandrel. Turn a plunger to fit it loosely, file two flats on one end and drill a hole there for a pin. The plunger's material and what the pin holds are not given (unknown).

Ibikoresho by'iyi ntambwe:

Ibikoresho bitazwiIbikoresho bitazwi1 plunger

Ibikoresho bikenewe:

Amakariso (Ikariso ry'Intoki)Amakariso (Ikariso ry'Intoki)
Imashini yo guhinguza icyumaImashini yo guhinguza icyuma
Icyuma Cyivumbura GihagazeIcyuma Cyivumbura Gihagaze
Ibyuma Byinshi byo GucukuraIbyuma Byinshi byo Gucukura
6

Mount and use

Fix the pump down with two ordinary bent clips over the barrel near its ends (Fig. 2). Put the suction bend in water, connect the delivery to the work and work the plunger. Cassell's: the pump "would stand a pressure of 250 lb. per square inch easily". The clip material is not given (unknown).

Ibikoresho by'iyi ntambwe:

Ibikoresho bitazwiIbikoresho bitazwi2 bent clips

Ibikoresho bikenewe:

Igifashi cy'imiyoboroIgifashi cy'imiyoboro

Ibikoresho

7

Ibikoresho bikenewe

11

CC0 Umurenge rusange

Iyi blueprint yasohowe munsi ya CC0. Ushobora gukoporora, guhindura, gukwirakwiza no gukoresha nta kwemererwa.

Shyigikira Umuremyi ugura ibicuruzwa binyuze muri Blueprint ye Komisiyo y'Umuremyi byashyizweho n'Abacuruzi, cyangwa kora verisiyo nshya y'iyi Blueprint ukayinjiza nk'isano muri Blueprint yawe kugira ngo musangire inyungu.

Ibiganiro

(0)

Injira kugira ngo ujye mu biganiro

Gutegura ibitekerezo...