Heil and Esch · Public domain (1909)
Rubber Stoppers: Pará Rubber with Ceresine, Moulded and Cured (Heil & Esch 1909)
Laboratory rubber stoppers from a 1909 rubber factory's book of mixings: Pará rubber with ceresine wax, sulphur and magnesia, run out as a cord, cut to weight, pressed into moulds and cured.
Source: Heil & Esch, The Manufacture of Rubber Goods (1909), mixing No. 34 (p. 108) and the stopper method (p. 135). They give no cure time or temperature. Using smoked ball rubber as their Pará, and the mill, clamps and steam vessel, are ours. Picture: their page of mixings.
Orta
1 day
Talimatlar
1
1
Weigh mixing No. 34
Weigh mixing No. 34
Weigh out 10,000 g Pará rubber, 2,000 g ceresine, 1,000 g sulphur and 100 g calcined magnesia (magnesia usta).
Bu adım için malzemeler:
İsli kauçuk top10000 g
Serezin mumu2000 g
Kükürt tozu1000 g
Magnezyum oksit100 gGerekli aletler:
Eşit kollu terazi2
2
Mix on the rolls
Mix on the rolls
Work the rubber on the mixing rolls and work the ceresine, sulphur and magnesia into it until the mixing is even.
Gerekli aletler:
İki merdaneli kauçuk karıştırıcısı3
3
Run a cord on the tube machine
Run a cord on the tube machine
Run the mixing through the tube machine as a cord of a size to suit the stoppers. It must be free from air bubbles, or the stoppers will be faulty after curing.
Gerekli aletler:
Kauçuk hortum makinesi4
4
Cut pieces to weight
Cut pieces to weight
Cut the cord into pieces of the exact weight of one stopper plus 2 or 3 per cent, for what squeezes out of the mould.
Gerekli aletler:
Maket Bıçağı
Eşit kollu terazi5
5
Press into moulds and clamp
Press into moulds and clamp
Press each piece into a mould and clamp the small moulds very tightly in iron clips.
Gerekli aletler:
Vulkanizasyon kalıbı
C işkence6
6
Cure in steam
Cure in steam
Cure the clamped moulds in a steam heater (Heil & Esch also name the sulphur bath). They give no time or temperature for stoppers; then open the moulds and take out the stoppers.
Gerekli aletler:
Tezgâh üstü otoklav
Vulkanizasyon kalıbıMalzemeler
4- 10000 gYer Tutucu
- 2000 gYer Tutucu
- 1000 gYer Tutucu
- 100 gYer Tutucu
Gerekli Aletler
7- Yer Tutucu
- Yer Tutucu
- Yer Tutucu
- Yer Tutucu
- Yer Tutucu
- Yer Tutucu
- Yer Tutucu
Bu planla yapılan
İlgili Blueprint'ler
Bu blueprint'ler bilgi paylaşır — teknikler, malzemeler veya ilkeler
CC0 Kamu Malı
Bu plan CC0 lisansıyla yayınlanmıştır. İzin almadan kopyalayabilir, değiştirebilir, dağıtabilir ve herhangi bir amaçla kullanabilirsiniz.
Planı üzerinden ürün satın alarak Maker'ı destekleyin, böylece Maker Komisyonu Satıcılar tarafından belirlenen komisyonu kazanırlar veya bu Planın yeni bir versiyonunu oluşturun ve gelir paylaşımı için kendi Planınıza bağlantı olarak ekleyin.