İşbirliği
SANAT
GÜZELLİK & SAĞLIK
ZANAAT
KÜLTÜR & TARİH
EĞLENCE
ÇEVRE
YİYECEK & İÇECEK
TERS MÜHENDİSLİK
BİLİMLER
SPOR
TEKNOLOJİ
GİYİLEBİLİR ÜRÜNLER

Knock-Down Tennis-Court Backstop: Guyed Yellow-Pine Towers on the Ground and Hooked-Down Netting (Boy Mechanic, 1919)
Edward R. Smith's take-down tennis backstop from The Boy Mechanic, Book 3 (1919): two towers about 14 ft high and 50 ft apart, of 4 x 4 and 2 x 4 in yellow pine, stand on brick footings and are guyed with heavy wire; the wire netting hangs from supporting wires on 2 ft crossarms and is hooked to tent stakes at the bottom, so the whole rig comes down between seasons.
Orta
About 2 days
Talimatlar
1
1
Sizes and wire gauges
Sizes and wire gauges
Jupyter defteri yükleniyor…
2
2
Read The Boy Mechanic, Book 3
Read The Boy Mechanic, Book 3
"Instead of setting the supports in the ground, they are set on the ground, and guyed by a system of wire braces."
3
3
Build the towers and footings
Build the towers and footings
Build two towers about 14 ft high from sound 4 by 4 in and 2 by 4 in yellow-pine timber, to stand 50 ft apart. Make brick foundations, anchored into the ground, for them to stand on, and sink anchors in the ground beyond each end.
Bu adım için malzemeler:
Çam kereste6 adet
Çiviler1 adet
Kare boyunlu yuvarlak başlı cıvata4 adet
Tuğla20 adetGerekli aletler:
El Testeresi
Kol matkabı ve ucu
Çekiç
Kürek
Şerit Metre4
4
Guy the towers
Guy the towers
Fasten end braces of heavy wire (No. 9) to the top of each tower and guy them to the sunken anchors; they carry the weight of the netting and let a ladder lean safely on the guyed end of a tower.
Bu adım için malzemeler:
Galvanizli Çelik Tel1 adetGerekli aletler:
Ahşap merdiven
Yassı Ağızlı Pense5
5
Rig the supporting wires and hang the netting
Rig the supporting wires and hang the netting
Run the supporting wires (No. 20 gauge, as printed) between the towers on crossarms of 1 by 1 in wood, 2 ft long, which stop side motion at the top; wire them to the netting and draw them up so it is fairly taut. Add more supporting wires with vertical leaders to the netting to draw its whole length taut. Let the netting run under the towers, held there by wires, nearly to the end guys.
Bu adım için malzemeler:
Yumuşak ağaç çıta2 adet
Galvanizli Çelik Tel1 adet
Galvanizli tel örgü1 adetGerekli aletler:
Ahşap merdiven
Yassı Ağızlı Pense
El Testeresi6
6
Hook down the bottom and mark the guys
Hook down the bottom and mark the guys
Hold the lower edge of the netting down with hooks pinned to the ground by tent stakes, so it can be unhooked to mow. Tie a white flag to each guy wire about 6 ft from the ground so players see it.
Bu adım için malzemeler:
Demir tel1 adet
Çadır kazığı12 adet
Bayrak2 adetGerekli aletler:
Çekiç
Yassı Ağızlı Pense7
7
Season and troubleshooting
Season and troubleshooting
Backstop troubleshooting.
Flow
Loading...
8
8
History and honest limits
History and honest limits
From "A Knock-Down Tennis-Court Backstop" by Edward R. Smith, in **The Boy Mechanic, Book 3**, Popular Mechanics, 1919 (Project Gutenberg 71856; checked on the archive.org scan boymechanic0003unse, p. 189). He gives no netting height or mesh, no tower framing details and no anchor type, and No. 20 gauge for the supporting cables is as printed. The tools and metric figures are ours.
Malzemeler
10- 6 adetYer Tutucu
- 1 adetYer Tutucu
- Yer Tutucu
- 20 adetYer Tutucu
- 2 adetYer Tutucu
- 2 adetYer Tutucu
- 1 adetYer Tutucu
- 1 adetYer Tutucu
- 12 adetYer Tutucu
- 2 adetYer Tutucu
Bu planla yapılan
İlgili Blueprint'ler
Bu blueprint'ler bilgi paylaşır — teknikler, malzemeler veya ilkeler
CC0 Kamu Malı
Bu plan CC0 lisansıyla yayınlanmıştır. İzin almadan kopyalayabilir, değiştirebilir, dağıtabilir ve herhangi bir amaçla kullanabilirsiniz.
Planı üzerinden ürün satın alarak Maker'ı destekleyin, böylece Maker Komisyonu Satıcılar tarafından belirlenen komisyonu kazanırlar veya bu Planın yeni bir versiyonunu oluşturun ve gelir paylaşımı için kendi Planınıza bağlantı olarak ekleyin.

