NGHỆ THUẬT
LÀM ĐẸP VÀ SỨC KHỎE
THỦ CÔNG
VĂN HÓA VÀ LỊCH SỬ
GIẢI TRÍ
MÔI TRƯỜNG
THỰC PHẨM VÀ ĐỒ UỐNG
KỸ THUẬT NGƯỢC
KHOA HỌC
THỂ THAO
CÔNG NGHỆ
THIẾT BỊ ĐEO

Monorail Sled: Two Tandem Plank Runners Shod With Strap Iron, Steered Lying Down (Boy Mechanic, 1915)
Harry Hardy's monorail sled from The Boy Mechanic, Book 2 (1915): two plank runners one behind the other under a 6 ft board, shod with square-edged strap iron that grips like a skate. The rider lies full length and steers the front runner with a bar, balancing like a cyclist.
Trung cấp
About 1 day
Hướng dẫn
1
1
His sketch in centimetres
His sketch in centimetres
Đang tải sổ tay Jupyter…
2
2
Read The Boy Mechanic, Book 2
Read The Boy Mechanic, Book 2
"Round iron or half-round iron should not be used, as these are liable to skid. The square, sharp edges of the strap iron prevent this and grip the surface just as a skate."
3
3
Cut and shoe the runners
Cut and shoe the runners
Cut the two runners from 1 in plank to the size and shape of his sketch: the front runner 2 ft long, the rear one 2-1/2 ft long and about 1 ft high (the sketch prints the rear length with an inch mark; it is drawn as 2-1/2 ft). Shoe them with strap iron 1 in wide and 1/4 in thick, keeping the edges square and sharp.
Vật liệu cho bước này:
Tấm gỗ cứng1 cái
Thanh thép dẹt1 cái
Vít gỗ1 cáiCông cụ cần thiết:
Cưa tay
Cưa lọng tay
Cưa sắt
Ê tô bàn nguội
Khoan tay
Bút chì
Thước dây cuộn4
4
Fit the rear runner
Fit the rear runner
Nail or bolt blocks on either side of the upper edge of the rear runner and screw the top board (6 ft long, 1 in thick) to them. Brace the runner with strap iron, as in the sketch.
Vật liệu cho bước này:
Ván thông1 cái
Tấm gỗ cứng1 cái
Thanh thép dẹt1 cái
Bu lông đầu tròn cổ vuông1 cái
Vít gỗ1 cáiCông cụ cần thiết:
Cưa tay
Cưa sắt
Khoan tay
Búa5
5
Fit the front runner and steering
Fit the front runner and steering
Fit the front runner the same way, but with only one pair of blocks at the centre and a thin piece of wood on their tops as the fifth wheel. Bore the hole for the steering post 6 in from the front end of the top, a little larger than the post. Round the post where it passes through the hole and leave its upper end square, to take the steering bar tightly.
Vật liệu cho bước này:
Tấm gỗ cứng1 cái
Thanh thép dẹt1 cái
Vít gỗ1 cáiCông cụ cần thiết:
Cưa tay
Khoan tay quay và mũi khoan
Đục gỗ
Bào tay6
6
Troubleshooting
Troubleshooting
Monorail sled troubleshooting.
Flow
Loading...
7
7
History and honest limits
History and honest limits
From "How to Make a Monorail Sled" by Harry Hardy, in **The Boy Mechanic, Book 2**, Popular Mechanics, 1915 (Project Gutenberg 44585; checked on the archive.org scan boymechanicbook200chic2, p. 50). The rear runner length is printed 2-1/2 with an inch mark but drawn longer than the 2 ft front runner, so it is read here as 2-1/2 ft. He gives no sizes for the blocks, braces or steering bar. The tools and metric figures are ours.
Vật liệu
5- 1 cáiTạm thời
- 1 cáiTạm thời
- 3 cáiTạm thời
- 1 cáiTạm thời
- Tạm thời
Công cụ yêu cầu
11- Tạm thời
- Tạm thời
- Tạm thời
- Tạm thời
- Tạm thời
- 1 vendor sell this, none ship to you yetTạm thời
- 1 vendor sell this, none ship to you yetTạm thời
- Tạm thời
- Tạm thời
- Tạm thời
- Tạm thời
Bản thiết kế này làm ra
Blueprint liên quan
Các blueprint này chia sẻ kiến thức — kỹ thuật, vật liệu hoặc nguyên tắc
CC0 Phạm vi công cộng
Bản thiết kế này được phát hành theo CC0. Bạn tự do sao chép, sửa đổi, phân phối và sử dụng cho bất kỳ mục đích nào mà không cần xin phép.
Hỗ trợ nhà sáng tạo bằng cách mua sản phẩm qua bản thiết kế, nơi họ nhận Hoa hồng nhà sáng tạo do nhà bán hàng đặt, hoặc tạo phiên bản mới và kết nối trong bản thiết kế riêng để chia sẻ doanh thu.


