Ukusebenzisana
UBUCIKO
UBUHLE NEMPILO
UBUCIKO BEZANDLA
AMASIKO NOMLANDO
EZOKUZIJABULISA
IMVELO
UKUDLA NEZIPHUZO
REVERSE ENGINEERING
IZAYENSI
EZEMIDLALO
UBUCHWEPHESHE
IZINTO EZIGQOKWAYO

Belt Sander: a Lathe-Driven Garnet-Belt Sander (Shop Notes, 1919)
A shop belt sander for dressing wood surfaces: a 6 in garnet-paper belt running over four crowned wooden pulleys, one driven by the lathe, pressed down onto the work with a hand float.
Best belt speed about 2,500 ft per minute; leave about 1 in between work and belt.
Source: Popular Mechanics Shop Notes for 1919, p. 3235. Picture: the article's drawing.
Ophakathi
Unknown
Imiyalelo
1
1
Turn the pulleys
Turn the pulleys
Build up four solid wood pulleys 10 in across with 8 in faces and turn them in the lathe with a very slight crown; too much crown harms the belt.
Izinto zokwakha zalesi sinyathelo:
Ipulangwe Lokhuni Oluqinile4 built-up pulleysAmathuluzi adingekayo:
Umshini wokuphendula ukhuni2
2
Mount the pulleys
Mount the pulleys
Mount one pulley on a firmly held arbor in the lathe and the other three on iron-pipe shafts on a frame (drawing). Turn and file a true journal on each pipe, pour babbitt bushings in the pulleys, and cut oil grooves in the pipe or babbitt. Supporting the shafts on one side lets the belt slip off; supporting both sides is stronger.
Izinto zokwakha zalesi sinyathelo:
Ipayipi lensimbi (linezindonga eziqinile, izingoni ezinemisongo)3 shafts
Insimbi engaziwa1 babbitt bushings
Amapulangwe omphayini1 frameAmathuluzi adingekayo:
Insimbi yokuhlikihla izinsimbi
Isipuni esinezimbobo
Isaha Sesandla
Isando3
3
Make the belt
Make the belt
Cut 6 in garnet paper (No. 1 1/2 for general work) so the ends just meet over the pulleys. Glue the smooth side at the joint, splice it with a strip of cloth about 1 in wide and then one about 3 in wide, cover each side with paper, and clamp between two small boards.
Izinto zokwakha zalesi sinyathelo:
Iphepha Lokugaya1 6 in garnet paper
Indwangu Yekotini1 ucezu
Uglu wezilwane1 ucezuAmathuluzi adingekayo:
Isibambo esiyi-C4
4
Set up and run
Set up and run
Run the belt at about 2,500 ft per minute using the lathe's cone pulley. Set the work about 1 in below the belt on a table or a low sliding platform (two sets of tongue-and-groove joints at right angles), start the machine and press the belt down with a float like a blackboard eraser, or a roller.
Izinto zokwakha zalesi sinyathelo:
Amapulangwe omphayini1 platform, floatAmathuluzi adingekayo:
Umshini wokuphendula ukhuniIzinto
7- 4 built-up pulleysIsibambeli
- Isibambeli
- 1 babbitt bushingsIsibambeli
- 1 platform, floatIsibambeli
- 1 6 in garnet paperIsibambeli
- 1 ucezuIsibambeli
- 1 ucezuIsibambeli
Amathuluzi Adingekayo
6- Isibambeli
- Isibambeli
- Isibambeli
- Isibambeli
- Isibambeli
- Isibambeli
Le blueprint yenza
CC0 Isizinda Somphakathi
Le blueprint ikhishwe ngaphansi kwe-CC0. Ukhululekile ukukopisha, ukuguqula, ukusabalalisa, nokusebenzisa ngaphandle kwemvume.
Sekela uMenzi ngokuthenga imikhiqizo nge-Blueprint yabo IKhomishane Yomenzi kumiswe ngabathengisi, noma dala inguqulo entsha yale Blueprint bese uyifaka njengoxhumaniso ku-Blueprint yakho ukuze wabelane ngemali engenayo.
