Bismuth: Sweated Out of Native Ore in Inclined Iron Tubes, the Schneeberg Way (Thorpe, 1912)
Charlie

Criado por

Charlie

4. novembro 2026DE
12
0
0
0
0

Bismuth: Sweated Out of Native Ore in Inclined Iron Tubes, the Schneeberg Way (Thorpe, 1912)

The old way of getting bismuth from ore that holds it as the metal: heat the lumps just enough in sloping iron tubes and the bismuth, which melts easily, runs out of the rock into pots under charcoal. It takes 30-60 minutes a charge but gets only about two-thirds of the metal. Not given: the furnace temperature. Source: E. Thorpe, Dictionary of Applied Chemistry vol. I (1912), Bismuth, p. 458. Picture: Thorpe's Fig. 1, the furnace in plan.
Intermediário
30-60 minutes per charge

Instruções

1

Pick and break the ore

Sort the ore (7-12 % bismuth) by hand from the waste rock as far as possible and break it into pieces the size of a hazel nut.

Materiais para este passo:

Minério de bismuto nativoMinério de bismuto nativo1 12 cwt per tube charge

Ferramentas necessárias:

MarteloMartelo
Balança industrial de plataformaBalança industrial de plataforma
2

Charge the tubes

Load about 12 cwt into each inclined iron tube of the furnace, leaving room to stir from the upper end. Close the upper ends with iron plates and the lower ends with plates pierced with round holes. Under each lower end stand an iron pot holding powdered charcoal, kept gently warm by a small charcoal fire.

Materiais para este passo:

Carvão vegetalCarvão vegetal1 powdered, in the pots and for the pot fire

Ferramentas necessárias:

Forno de liquação de bismutoForno de liquação de bismuto
Cadinho de ferroCadinho de ferro
3

Sweat out the bismuth

Fire the furnace with wood so that the metal flows easily. In about 10 minutes the bismuth begins to run into the pots, where the charcoal covers it from the air. Stir the ore now and then with an iron rod from the upper end; in 30-60 minutes the charge is done. 20 cwt of ore burns about 63 cubic feet of wood.

Materiais para este passo:

LenhaLenha1 about 63 cu ft per 20 cwt of ore

Ferramentas necessárias:

Forno de liquação de bismutoForno de liquação de bismuto
Vareta de ferroVareta de ferro
4

Rake out and recharge

Rake the spent ore (bismuth barley) out of the upper end into the tank and refill at once with fresh ore.

Ferramentas necessárias:

Ancinho de ferroAncinho de ferro
Forno de liquação de bismutoForno de liquação de bismuto
5

Cast ingots

Ladle the bismuth from the pots into moulds and cast ingots of 25-50 lb.

Ferramentas necessárias:

Cadinho de ferroCadinho de ferro
Colher de fundiçãoColher de fundição
LingoteiraLingoteira

Materiais

3
  • 1 12 cwt per tube charge
    Referência
  • 1 powdered, in the pots and for the pot fire
    Referência
  • 1 about 63 cu ft per 20 cwt of ore
    Referência

Ferramentas necessárias

8

CC0 Domínio Público

Este blueprint é liberado sob CC0. Você é livre para copiar, modificar, distribuir e usar este trabalho para qualquer finalidade, sem pedir permissão.

Apoie o Maker comprando produtos através do Blueprint, onde ele ganha uma Comissão Maker definida pelos vendedores, ou crie uma nova versão deste Blueprint e inclua-o como conexão no seu próprio Blueprint para compartilhar receita.

Discussão

(0)

Entrar para participar da discussão

Carregando comentários...