Cupola Furnace: the Common Foundry Cupola with a Drop Bottom (Bolland, 1893)
The founder's 'common cupola': an upright steel shell lined with firebrick, standing on four columns over a drop bottom, with a wind-box round it feeding the tuyeres and a charging door high up. Coke and pig iron go in at the top in layers; blast at the tuyeres melts the iron, which runs out at the spout.
Variable: the inside diameter, 24 to 84 in, which sets height, tuyeres, blower and charges. Fig. 9's 36 in cupola is 12 ft to the charging hole and takes 840 lb coke and 2520 lb iron on the bed, then 302 lb coke and 2718 lb iron per charge.
Source: S. Bolland, The Iron Founder Supplement (1893), pp. 34-54. Unknown: shell plate and brick sizes. Picture: Fig. 9 of the book.
Especialista
Unknown
Instruções
1
1
Size the cupola
Size the cupola
Choose the inside diameter from the iron needed per hour: 10 tons in two hours (about 10,760 lb an hour) needs 48 in; 6 tons, 40 in. Make it tall enough that the gas burns before it escapes: a 50 in cupola is 14 ft from the base to the bottom of the charging hole, Fig. 9's 36 in one 12 ft. Above 60 in, keep 60 in at the tuyeres and widen above them, since the blast cannot reach the middle of a wider stock.
Ferramentas necessárias:
Dimensões desconhecidas2
2
Build the shell, columns and drop bottom
Build the shell, columns and drop bottom
Build a steel shell with a charging hole and door, standing on four columns. Close the bottom with swing doors on a central prop, so the whole contents can be dropped at the end of a heat. Put a slag hole a little below the tuyeres and a spout at the bottom. Ours: mild steel plate, iron castings for the bottom doors. Not given: plate thickness.
Materiais para este passo:
Chapa grossa de aço macio1 shell, charging door
Peças fundidas de ferro1 drop-bottom doors
Metal desconhecido1 columns, prop, spoutFerramentas necessárias:
Máquina de solda a arco
Dimensões desconhecidas3
3
Fit the tuyeres and wind-box
Fit the tuyeres and wind-box
Ring the cupola with a wind-box feeding the tuyeres, with a main blast pipe sized from the table (good for runs up to 100 ft). Tuyere area grows with the diameter: a 24 in cupola needs the area of 1 1/2 round 6 in tuyeres (or two flat ones 10 1/2 x 2 in), a 60 in about 13 1/2 (or eight flat 16 1/2 x 3 in), an 84 in 31 (or sixteen flat 16 x 3 1/2 in). Never reduce the tuyere area. A 42 in cupola takes a No. 3 Root blower and a 6 h.p. engine.
Materiais para este passo:
Chapa grossa de aço macio1 wind-box
Metal desconhecido1 tuyeres, blast pipeFerramentas necessárias:
Máquina de solda a arco
Soprador de ar4
4
Line it with firebrick
Line it with firebrick
Line the shell with firebrick, every brick rubbed well down on the next and fitting the shell closely, set in mortar of the same nature as the bricks. A good lining lasts one to two years if the melter mends it each morning with thin coats of daubing, keeping its first shape. Ours: fireclay bricks and refractory clay mortar.
Materiais para este passo:
Tijolos refratários1 lining
Argamassa de argila refratária1 setting and daubingFerramentas necessárias:
Colher de pedreiro5
5
Make the bed and melt
Make the bed and melt
Ram a sand bottom so it lies about 10 in below the tuyeres. Lay the fuel bed, about 22 in of coke above the tuyeres (840 lb in Fig. 9's 36 in cupola), and the first iron (2520 lb), then alternate charges of coke and iron (302 lb and 2718 lb). Blow: about 30,000 cubic feet of air melts a ton of iron. On long heats flux with white marble chips and draw the slag off at the slag hole. At the end, drop the bottom.
Ferramentas necessárias:
Areia
Coque metalúrgico
Lingotes de ferro-gusa
Soprador de arMateriais
5- 1 wind-boxReferência
- 1 drop-bottom doorsReferência
- 1 tuyeres, blast pipeReferência
- 1 liningReferência
- 1 setting and daubingReferência
Ferramentas necessárias
7- Referência
- Referência
- Referência
- Referência
- Referência
- Referência
- Referência
Materiais de Blueprints conectados

10% de atribuição
Mild Steel Plate and Sheet Hammered from a Billet
por Forge
Moderno
42
0
0
0
5
0

10% de atribuição
Fireclay Firebricks
por Clay
Cerâmica e Argila
39
0
0
0
4
0

10% de atribuição
Casting Iron in a Cupola Furnace — Re-Melting Pig Iron into Finished Castings
por Piett
Trabalho em Metal
53
0
0
0
6
0

10% de atribuição
Making Coke from Coal — The Smokeless Fuel That Forged the Industrial Revolution
por Gimli
Trabalho em Metal
73
0
0
0
4
0
Este projeto faz
CC0 Domínio Público
Este blueprint é liberado sob CC0. Você é livre para copiar, modificar, distribuir e usar este trabalho para qualquer finalidade, sem pedir permissão.
Apoie o Maker comprando produtos através do Blueprint, onde ele ganha uma Comissão Maker definida pelos vendedores, ou crie uma nova versão deste Blueprint e inclua-o como conexão no seu próprio Blueprint para compartilhar receita.