ARTE
BELEZA E BEM-ESTAR
ARTESANATO
CULTURA E HISTÓRIA
ENTRETENIMENTO
MEIO AMBIENTE
COMIDA E BEBIDAS
FUTURO VERDE
ENGENHARIA REVERSA
SCHOOL PROJECTS
CIÊNCIAS
ESPORTES
TECNOLOGIA
TECNOLOGIA VESTÍVEL
Building Leonardo da Vinci's Revolving Bridge — The Swing Bridge for a Marching Army
Emma

Criado por

Emma

2. julho 2026SE
9
0
0
0
0

Building Leonardo da Vinci's Revolving Bridge — The Swing Bridge for a Marching Army

Around 1487 Leonardo da Vinci designed a bridge that swings. Meant for armies on the move, it pivots on a single point on one bank, sweeps across the river in one rigid span, and drops onto the far side — then swings back in moments to leave the river uncrossable behind. Light enough for a handful of soldiers to work with rope, pulley and counterweight, yet strong enough to carry men and light artillery, it is the same swing-bridge principle used today where a bridge must open for passing boats. This blueprint reconstructs Leonardo's revolving bridge as a working model.
Avançado
24

Instruções

1

Understand the design

Leonardo's bridge crosses a river in a single rigid span that pivots horizontally on one bank. An army can swing it out to cross, then swing it back to stop the enemy following — quick to deploy and quick to withdraw, unlike a fixed bridge.
2

Build the span

Build a light but stiff timber truss as long as the crossing. It must be rigid enough to carry marching men and light guns, yet light enough that a small crew can swing it — a classic strength-to-weight problem Leonardo solved with a trussed frame.

Materiais para este passo:

Beech LumberBeech Lumber6 peças

Ferramentas necessárias:

Hand SawHand Saw
3

Set the pivot

Anchor a strong vertical pivot pin on the near bank and seat one end of the span on it, so the whole bridge can rotate freely in the horizontal plane about that single point.

Materiais para este passo:

Dowel RodDowel Rod1 peça

Ferramentas necessárias:

Hand AugerHand Auger
4

Rig the ropes and counterweight

Run ropes from the free end of the span through pulleys back to a counterweight, so the counterweight balances most of the bridge's weight. Now a few people hauling the ropes can move a very heavy span with ease.

Materiais para este passo:

Binding RopeBinding Rope40 metros

Ferramentas necessárias:

KnifeKnife
5

Fit a roller at the free end

Mount a wheel or roller under the swinging end so that, as the bridge comes across, it rolls smoothly up onto the far bank rather than dragging or dropping short.

Materiais para este passo:

Beech LumberBeech Lumber1 peça

Ferramentas necessárias:

Hand AugerHand Auger
6

Swing it across

Haul on the ropes. With the counterweight carrying the load, the span pivots out over the water and lands its rolling end on the opposite bank — a full river crossing thrown down in minutes.
7

Cross and retract

Send the troops over, then swing the bridge straight back to the near bank. In moments the crossing is gone and the river is a barrier again — the tactical point of a bridge that moves.
8

See the engineering

A single pivot, rope-and-pulley mechanical advantage, and a counterweight turn a massive span into something a small crew can swing quickly and safely. The same principle runs every modern swing bridge that opens to let ships pass.

Materiais

3

Ferramentas necessárias

3

You can swap these in

Can't get one of the materials? Swap it for an equivalent — these work just as well.

CC0 Domínio Público

Este blueprint é liberado sob CC0. Você é livre para copiar, modificar, distribuir e usar este trabalho para qualquer finalidade, sem pedir permissão.

Apoie o Maker comprando produtos através do Blueprint, onde ele ganha uma Comissão Maker definida pelos vendedores, ou crie uma nova versão deste Blueprint e inclua-o como conexão no seu próprio Blueprint para compartilhar receita.

Discussão

(0)

Entrar para participar da discussão

Carregando comentários...