Oil Storage Tank: a Riveted Steel Tank with Globe Roof (Bell, 1923)
An above-ground oil tank of riveted 'tank steel': a flat bottom, rings of plate lapped and riveted, angle irons at top and bottom, and a self-supporting globe roof. Every seam is caulked oil-tight and the tank is water-tested before painting.
Variable: capacity. Bell's Fig. 158 is 1,000 barrels: 20 ft inside diameter, about 20 ft 3 in high, four rings of 1/4 in plate, sixteen 3/16 in roof plates rising 3 ft. Standard tanks run from 500 to 80,000 barrels (120 ft x 40 ft).
Source: H. S. Bell, American Petroleum Refining (1923), pp. 286-306. Picture: Fig. 158 of the book.
ཆེས་མཁས་པ
Unknown
ལམ་སྟོན
1
1
Choose the size and plates
Choose the size and plates
Pick the capacity from the standard sizes (1,000 barrels: 20 ft diameter, 20 ft high). Take plate thickness from Bell's chart for the head and diameter, with a factor of safety of at least 2 1/2 for refinery tanks. Use at least 1/4 in for the shell; bottom 1/4 in on larger tanks, 3/16 in on smaller. Rings are 6 ft (72 in plates); about 7 ft is the limit.
ལག་ཆས་དགོས་མཁོ:
མ་ཤེས་པའི་ཚད།2
2
Prepare the ground
Prepare the ground
Level the ground in a circle 10 ft wider than the tank and remove all vegetable growth. Avoid a mix of cut and fill. In old yards filled with cinders, dig them out at least 8 in deep and replace with fine gravel, loam or sand. On poor soil, use piles.
གོམ་པ་འདིའི་རྫས་རིགས:
རྡོ་ཕྲན།1 as neededལག་ཆས་དགོས་མཁོ:
མ་ཤེས་པའི་ཚད།3
3
Punch and scarf the plates
Punch and scarf the plates
Punch the rivet holes. For 1/4 in plate with 5/8 in rivets, a single lap seam has holes 2 1/4 in apart and 1 1/8 in from the edge; keep the clear space between holes no more than 6 or 7 times the plate thickness, or the caulked edge springs. Scarf the corner of the middle plate where three plates meet: cold up to 1/4 in, hot above, drawn to an edge no thicker than 1/16 in.
ལག་ཆས་དགོས་མཁོ:
བུག་གནོན་འཕྲུལ།
ལྗིད་ཏོ་ཏོའི་ཐོ་བ་ཆེན་མ4
4
Build the bottom on horses
Build the bottom on horses
Lay, rivet and caulk the bottom on trestles or horses about 30 in high. Rivet the bottom angle iron (Fig. 158: 3 x 3 x 5/16 in) with a 1/4 in bent-plate shoe behind each angle splice; caulk the shell leg past the shoe at least 12 in, or better bevel and caulk the angle all round. Assemble and drive the first ring while the bottom is still up. Test the bottom under 6 to 8 in of water. Coat its underside with ship-bottom or heavy asphalt paint.
གོམ་པ་འདིའི་རྫས་རིགས:
ལྕགས་འཇམ་གྱི་ཤོག་ལེབ་སྟུག།1 bottom, first ring
ལྕགས་འཇམ་གྱི་ཟུར་ལྕགས།1 bottom angle
ལྕགས་ཀྱི་གཟེར།1 དུམ་བུ།
ངོ་མ་ཤེས་པའི་རྒྱུ་ཆ།1 asphalt paintལག་ཆས་དགོས་མཁོ:
གཟེར་བརྡུང་གི་ཐོ་བ།
བུག་ཁ་རྒྱ་སྐྱེད་ཆས།
ཆུ།
ཚོན་པིར་ཡངས་ཏོག་ཏོ།5
5
Lower it and raise the shell
Lower it and raise the shell
Raise the tank on jacks round the edge, clear out the horses and debris, and lower the bottom to grade. Rivet and caulk the remaining rings from scaffolds: floating scaffolds where water is at hand (water is pumped in as each ring is caulked tight, testing as you go), or brackets bolted through punched holes, later plugged with hot rivets. Where three plates meet, bolt them, heat cherry red with an oil-burning torch and lay the joint up with sledges before riveting. Fit the top angle (2 1/2 x 2 1/2 x 5/16 in) and a flanged steel manhole in the bottom ring.
གོམ་པ་འདིའི་རྫས་རིགས:
ལྕགས་འཇམ་གྱི་ཤོག་ལེབ་སྟུག།1 rings
ལྕགས་འཇམ་གྱི་ཟུར་ལྕགས།1 top angle
ལྕགས་ཀྱི་གཟེར།1 དུམ་བུ།ལག་ཆས་དགོས་མཁོ:
གཅུས་གཟེར་ཡར་འདེགས་ཆས།
གཟེར་བརྡུང་གི་ཐོ་བ།
བུག་ཁ་རྒྱ་སྐྱེད་ཆས།
མེ་ཤིང
ལྗིད་ཏོ་ཏོའི་ཐོ་བ་ཆེན་མ
ཆུ།6
6
Fit the globe roof
Fit the globe roof
For tanks up to 54 ft across, rivet on a self-supporting globe roof of segmental 3/16 in plates (Fig. 158: sixteen plates, 1/4 in centre plate, 3 ft rise); cold riveting is fine here. Make it gas-tight, with one vent at the apex covered by brass or monel wire cloth of at least 50 mesh.
གོམ་པ་འདིའི་རྫས་རིགས:
ལྕགས་འཇམ་གྱི་ཤོག་ལེབ་སྟུག།1 roof
ལྕགས་ཀྱི་གཟེར།1 དུམ་བུ།ལག་ཆས་དགོས་མཁོ:
གཟེར་བརྡུང་གི་ཐོ་བ།7
7
Test and paint
Test and paint
Fill the tank with water to test it before painting; it shows the important leaks, though not always tightness for light oils. Wire-brush off mill scale and rust. Give shell and roof three coats: one of red lead ground in boiled linseed oil, then two of good grey graphite paint.
གོམ་པ་འདིའི་རྫས་རིགས:
ཞ་ཉེའི་དམར་པོ (ལི་ཁྲི)1 first coat
བསྐོལ་བའི་ལིན་སིཊ་སྣུམ།1 དུམ་བུ།
ངོ་མ་ཤེས་པའི་རྒྱུ་ཆ།2 grey graphite paintལག་ཆས་དགོས་མཁོ:
ཆུ།
ལྕགས་སྐུད་ཀྱི་ཕྱགས་མ་ཆ་ཚན།
ཚོན་པིར་ཡངས་ཏོག་ཏོ།རྫས་རིགས
7- 1 as neededས་ཆ་འཛིན
- ས་ཆ་འཛིན
- 1 top angleས་ཆ་འཛིན
- 1 དུམ་བུ།ས་ཆ་འཛིན
- 2 grey graphite paintས་ཆ་འཛིན
- 1 first coatས་ཆ་འཛིན
- 1 དུམ་བུ།ས་ཆ་འཛིན
མཐུད་སྦྲེལ་བིལུ་པིརིན་ཊི་རྫས་རིགས

འབུལ་ལམ 10%
Mild Steel Plate and Sheet Hammered from a Billet
Forge གྱིས
དེང་རབས
༤༡
༠
༠
༠
༥
༠

འབུལ་ལམ 10%
Hot-Rolled Steel Angles and Channels
Forge གྱིས
ལྕགས་བཟོ
༢༥
༠
༠
༠
༢
༠

འབུལ་ལམ 10%
Steel Rivets Forged in a Nail Header
Forge གྱིས
མགར་བ།
༢༢
༠
༠
༠
༡
༠

ཉེན་ཁ་ཅན།
འབུལ་ལམ 10%
Making Red Lead (Minium) — The Pigment That Named the Art of Miniature Painting
Charlie གྱིས
སྒྱུ་རྩལ
༡༡༠
༠
༠
༠
༢
༠
བིལུ་པིརིན་ཊི་འདི་གིས་བཟོ་མི
CC0 སྤྱི་དབང
བིལུ་པིརིན་ཊི་འདི་CC0 འོག་བཀྲམས་ཡོད། ཁྱེད་རང་གིས་ཆོག་མཆན་མ་བཞེས་པར་ཕབ་ལེན་དང་བཟོ་བཅོས། བགོ་བཤའ། དགོས་མཁོ་གང་ལའང་བཀོལ་སྤྱོད་བྱས་ཆོག
བཟོ་མཁན་ལ་རྒྱབ་སྐྱོར་བྱེད་པའི་ཆེད་ཁོང་ཚོའི་བིལུ་པིརིན་ཊི་བརྒྱུད་ཐོན་སྐྱེད་ཉོ། བཟོ་མཁན་གྱིས བཟོ་མཁན་གྱི་ཁེ་ཕོགས ཚོང་པས་གཏན་འཁེལ་བྱས་པ། ཡང་ན་བིལུ་པིརིན་ཊི་འདིའི་པར་གསར་བཟོས་ཏེ་ཁྱེད་རང་གི་བིལུ་པིརིན་ཊི་ནང་མཐུད་སྦྲེལ་བྱས་ཏེ་ཡོང་སྒོ་བགོ་བཤའ་བྱེད།