The gravity stamp mill: five heavy iron stamps stand in a cast-iron mortar on a timber block. Cams on a turning shaft lift each stamp by its tappet and let it fall by its own weight onto the ore on a die. Water washes the crushed ore out through a screen. Result: a stamp battery that pounds ore to sand, at 80 to 110 drops a minute. Source: R. H. Richards, Ore Dressing, vol. I (1903), Chapter V, Gravity Stamps. Unknown: one complete set of sizes; Richards gives the range found in the mills. Picture: Fig. 90 of the book.
高级
Unknown

说明

1

Dig and level the foundation

Dig a trench in gravel, or blast one in rock, about 2 feet longer than the mortar block at each end and about 2 feet wider at each side. Level the bottom with tamped concrete, sand or clay. Concrete should be at least 30 inches thick, or it may crumble. Two layers of 2-inch plank spiked together may go on top.

此步骤所需材料:

混凝土混凝土1 levelling layer
木板材木板材1 two layers of 2-inch plank

所需工具:

平头锹平头锹
锤子锤子
2

Stand the mortar block

Stand timbers or planks on end in the trench as the mortar block, sized for one five-stamp mortar. The mills used everything from 30 x 30 inch squared timbers to 2 x 12 inch planks bolted together. Set vertical bolts 3 to 4 feet long into the block to hold the mortar down. Not given: the bolts' metal.

此步骤所需材料:

方材方材1 mortar block
未知金属未知金属1 hold-down bolts

所需工具:

扳手套装扳手套装
未知尺寸未知尺寸
3

Build the frame

On mud sills and cross sills, stand the posts (end posts 12 x 24 inches in most mills) with buckstaves, a platform, and lower and upper guide timbers. The guides keep the stamp stems vertical. Fit finger bars on a jack shaft between the posts, so each stamp can be propped up under its tappet. The frame carries the cam shaft and the drive.

此步骤所需材料:

方材方材1 sills, posts, guide timbers, platform
未知金属未知金属1 bolts and jack shaft

所需工具:

扳手套装扳手套装
未知尺寸未知尺寸
4

Set the mortar, dies and screen

Bed the cast-iron mortar on tarred blankets or sheet rubber on the mortar block, for an even bearing, and bolt it down. Put the dies in its bottom: cylinders on square foot plates that fill the floor of the mortar. Mount a screen of punched Russia sheet iron in a wooden frame over the opening in front.

此步骤所需材料:

铸铁件铸铁件1 mortar and five dies
天然橡胶板天然橡胶板1 packing
俄罗斯铁皮俄罗斯铁皮1 screen

所需工具:

扳手套装扳手套装
5

Make the five stamps

Each stamp has four parts. The shoe is chilled cast iron, its butt cast in heavy chills and its shank in sand. The boss is tough cast iron, the shoe's diameter and often 18 inches long, with sockets for the shoe shank and the stem and two keyways for knock-out wedges. The stem is solid wrought iron or mild steel, turned true and tapered at both ends so it can be reversed. The tappet is cast iron, with a flange above and below, locked on the stem by a gib and keys. Put the extra weight in the boss. Louis designs for 11 to 14 pounds of stamp per square inch of die; the mills used stamps of 650 to 1,100 pounds.

此步骤所需材料:

铸铁件铸铁件1 shoes, bosses, tappets
锻铁条锻铁条1 stems, gibs, keys

所需工具:

金属车床金属车床
未知尺寸未知尺寸
6

Fit the cam shaft and drive

Turn a wrought-iron or steel cam shaft true, with a key seat, and key on five cams. Each cam usually has two arms with spiral lifting faces, cast iron with chilled faces or cast steel. Drive the shaft by a rubber belt from the main shaft, over a pulley of wood built on a cast-iron hub and flanges, with a tightener. Not given: the engine or wheel that turns the main shaft.

此步骤所需材料:

锻铁条锻铁条1 cam shaft
铸铁件铸铁件1 cams, pulley hub and flanges
木板材木板材1 pulley rim
传动带传动带1 rubber belt

所需工具:

金属车床金属车床
扳手套装扳手套装
7

Add the water and the feed

Run one or two 1-inch water pipes into the back of the mortar, each with a plug cock that stays where it is set. Feed ore from the bin by a chute to an automatic feeder. One stamp trips the feeder when the ore layer on its die gets too thin, and a hand screw adjusts the point where it trips. Ore can also be fed by hand with a shovel.

此步骤所需材料:

水管水管1 water pipes
未知阀门未知阀门1 plug cocks
未知金属未知金属1 feeder and chute

所需工具:

扳手套装扳手套装
铁锹铁锹
8

Set up each stamp

Lay a 3-inch plank on the dies and set the bosses on it. Lower the stems into them and tap each stem down with a hammer, a board guarding its top, then drop it a few times at a very low drop. Hoist the stamp, put the shoe in place with wooden staves around its shank, and drop it on the plank to drive the shoe home; the staves swell when wet and hold it. Swap the plank for a block as high as the drop. Slip the tappet on, turn the cam until the tappet rests on its point, drive the keys home and drop the stamp gently a few times.

此步骤所需材料:

木楔木楔1 staves

所需工具:

木板材木板材
锤子锤子
滑车组滑车组
9

Run the battery

Drop the stamps in order 1, 3, 5, 2, 4 (numbered from the left, standing behind the battery), so no two neighbours fall one after the other. The California practice is 80 to 110 drops a minute with a 5 to 9 inch drop. The cams turn the stamps as they lift, which evens out wear on shoes and dies. Lubricate the cams; soft soap with graphite is best. As shoes and dies wear, reset the tappets to restore the drop, and keep the height of discharge, from die to screen, the same.

所需工具:

石墨粉石墨粉
未知材料未知材料
扳手套装扳手套装

材料

12
  • 1 levelling layer
    占位符
  • 1 pulley rim
    占位符
  • 1 sills, posts, guide timbers, platform
    占位符
  • 1 feeder and chute
    占位符
  • 1 cams, pulley hub and flanges
    占位符
  • 占位符
  • 占位符
  • 1 cam shaft
    占位符
  • 1 rubber belt
    占位符
  • 1 water pipes
    占位符
  • 1 plug cocks