合作
艺术
美容与健康
工艺
文化与历史
娱乐
环境
食品与饮料
逆向工程
科学
体育
技术
可穿戴设备

Steam Still: a Horizontal Still with Steam Coils and Scrubbing Tower (Bell, 1923)
A refinery still heated only by steam: a horizontal riveted shell with closed steam coils and open steam sprays in the bottom, and a tower of broken stone or tile on top where rising vapour meets the incoming feed. Used to re-run naphtha and kerosene and to strip naphtha from lubricating stocks without a fire.
Variable: batch, semi-continuous, or continuous with four baffled compartments. Bell's Fig. 39 still is 10 x 30 ft.
Source: H. S. Bell, American Petroleum Refining (1923), pp. 105-109. Unknown: plate thickness. Picture: Fig. 39 of the book.
专家
Unknown
说明
1
1
Build the shell
Build the shell
Rivet a horizontal cylindrical shell (Fig. 39: 10 x 30 ft) with the plate seams running straight round it (Fig. 36), cheaper than a fire still's layout; hemispherical heads are an expense with no clear reason. Fit a manhole, a drain, flanges for oil and steam and a nozzle for the tower.
此步骤所需材料:
低碳钢板1 shell, heads
低碳钢角钢1 个
钢铆钉1 个所需工具:
冲床
铆钉锤
未知尺寸2
2
Fit coils, sprays and baffles
Fit coils, sprays and baffles
Lay closed steam coils in the bottom with open steam sprays beside them. For continuous running, divide the shell into four compartments with cross baffles, leaving small openings at the bottom so condensed water drains to the water pot at the rear. Give the coils 62.5 sq ft of heating surface per 100 gallons taken overhead per hour: 33 % in the first compartment, 28 % in the second, 22 % in the third, 17 % in the rear. A semi-continuous still needs no baffles.
此步骤所需材料:
蒸汽盘管1 62.5 sq ft per 100 gal/h
钢管(厚壁、螺纹端)1 open sprays, header
蒸汽阀2 个
低碳钢板1 baffles所需工具:
铆钉锤3
3
Add the scrubbing tower
Add the scrubbing tower
Mount a combined scrubbing and dephlegmating tower on the still, filled with broken stone or tile. The feed enters at its top and trickles down against the rising vapour and steam, which condenses the heavier fractions and carries them back to the still; the vapour goes on to the condensers.
此步骤所需材料:
低碳钢板1 tower
钢铆钉1 个
碎石1 broken stone or tile所需工具:
铆钉锤4
4
Set it
Set it
Settings are simple: brick cross piers or steel frames, with brick or concrete dividing walls between stills where they must carry the tower and heat exchangers. Pipe the residual outlet with a valve.
此步骤所需材料:
砖1 cross piers
闸阀1 residual所需工具:
泥抹子材料
9- 1 tower占位符
- 1 个占位符
- 1 个占位符
- 1 62.5 sq ft per 100 gal/h占位符
- 1 open sprays, header占位符
- 2 个占位符
- 1 broken stone or tile占位符
- 1 cross piers占位符
- 1 residual占位符
此蓝图制作
CC0 公共领域
此蓝图以 CC0 协议发布。你可以自由复制、修改、分发和使用此作品,无需征得许可。
通过购买蓝图中的产品支持创客,他们将获得 创客佣金 (由供应商设定),或创建此蓝图的新版本并将其作为连接包含在你自己的蓝图中以分享收入。

