合作
艺术
美容与健康
工艺
文化与历史
娱乐
环境
食品与饮料
逆向工程
科学
体育
技术
可穿戴设备

The Troughed Belt: Two Tipped Rollers That Doubled What a Conveyor Carries
A flat belt is a poor container. Loose material spreads on it until the heap reaches the angle it can stand at, and most of the belt ends up carrying air.
Thomas Robins' answer in 1896 was to stop supporting the belt on one roller and support it on three — a flat one in the middle and two tipped up at the sides — so the belt folds into a shallow trough and becomes its own container. The same rubber then carries close to three times as much.
This rung works out how much, finds the trough angle where the gain turns round, and gets at the one number the whole calculation rests on. It also covers the other figure on Robins' drawing sheet, the crowned pulley, which is what stops the belt walking off the end.
中级
About 3 hours
说明
1
1
Watch a flat belt fail at the job
Watch a flat belt fail at the job
Lay a strip of belting, or any stiff sheet, flat on the bench and pour dry sand onto it in a line. The sand spreads sideways until its surface reaches its angle of repose, and then it stops. Measure the width of the heap and its height at the centre.
Notice two things. The heap has spread well outside where you poured it — so on a moving belt this is the spillage line, and it is why a flat belt needs skirts. And the cross-section is a flat triangle: almost all of the belt width is under material only a few millimetres deep.
Now lift the two edges of the strip so it folds into a shallow trough, and pour again. The material stays where you put it and stacks. That is the entire invention, and you have just done it by hand.
The angle the loose surface stands at is worth measuring while you are here. Sand is not stone and dry is not damp; record what you actually have, because step 4 needs it.
此步骤所需材料:
粗砂(建筑/陶艺)1 bucket
橡胶板1 个所需工具:
量角器
直尺
卷尺
水桶2
2
Build a three-roll idler stand
Build a three-roll idler stand
One centre roller horizontal, two side rollers tipped up at the same angle, all three in the same vertical plane and their working faces meeting end to end.
Cut a frame from angle iron. Set the centre roll first and get it level with a spirit level — everything else is measured from it. Then set the two side rolls: mark the trough angle with a protractor, and check that the gap at each junction is the same on both sides. An idler whose side rolls are at different angles steers the belt, permanently, and no amount of adjustment further down the run will fix it.
The rollers themselves must turn freely and must be **concentric**. A roller with a flat spot or an out-of-true shell hammers the belt once per revolution; over a shift that is hundreds of thousands of hammer blows into the same carcass.
Make the stand square to the belt line. The commonest tracking fault on a real conveyor is not a worn belt, it is an idler stand that has been knocked out of square by a loader.
此步骤所需材料:
槽形托辊3 个
低碳钢角钢2 个
机螺钉12 个
立式轴承座(KP08)6 个所需工具:
MIG 焊机
自动变光焊接面罩
角磨机
充电式电钻
钻头套装
扳手套装
水平尺
量角器
卷尺
安全眼镜
皮革工作手套
护耳器(耳罩,SNR 30 dB)3
3
The crowned pulley, which is on the same drawing sheet
The crowned pulley, which is on the same drawing sheet
Robins' sheet 2 carries two figures. One is the troughing idler. The other is a pulley whose diameter is slightly larger in the middle than at the ends — a **crown**.
A belt climbs toward the tight side. On a crowned pulley the middle is the tight side, because the belt has further to go over the bulge, so the belt is continuously steered back to the centre. It is self-correcting rather than adjusted.
Try it. Turn a short wooden roller with a taper each way — a millimetre of crown over a couple of hundred millimetres is plenty — and run a strip of cloth over it. Start the strip deliberately off to one side and turn the roller: the strip walks back to the middle. Turn a second roller dead cylindrical and repeat: the strip walks off the end and keeps going.
Crowning is for the *head and tail pulleys*, not for the carrying idlers. Crowned carrying rollers under a troughed belt fight the trough and wear the belt's underside.
One caution the old texts all give: crowning steers a belt, it does not fix a misalignment. If a belt runs off on a crowned pulley, the frame is out of square and the crown has run out of authority.
此步骤所需材料:
木榫钉2 个
橡胶板1 个所需工具:
充电式电钻
砂纸套装
6 英寸数显卡尺
直尺4
4
How much the trough is actually worth
How much the trough is actually worth
正在加载 Jupyter 笔记本…
5
5
Measure your bulk density, then compute the tonnage
Measure your bulk density, then compute the tonnage
正在加载 Jupyter 笔记本…
6
6
Load it in the middle, and load it going the right way
Load it in the middle, and load it going the right way
Two loading faults destroy belts, and both are about where the material arrives rather than how much of it there is.
**Off-centre loading** puts the whole weight on one side of the trough. The belt cambers, runs off, and rubs a structure until it is cut. Centre the chute on the belt and check it loaded, not empty.
**Loading against the belt** is worse. If the material lands with a sideways or backward velocity component, every piece has to be accelerated up to belt speed by scrubbing against the rubber. Turn the chute so the material arrives already moving in the belt's direction and at something near its speed, and that scrubbing disappears.
Run the belt with the load and watch the material at the loading point. If you can see the stone skidding, the chute is wrong, and the top cover is being sanded off at that one spot.
Guard the nip points before you run anything. The gap where the belt meets a pulley or an idler will take a hand in and will not let go, and a conveyor cannot be stopped fast enough to matter. Pull-cord stops along the length, fixed guards at every pulley, and nobody reaches over a running belt.
此步骤所需材料:
工业输送带1 个
骨料石1 bucket所需工具:
工业输送带电机
扳手套装
水平尺
卷尺
安全眼镜
皮革工作手套
护耳器(耳罩,SNR 30 dB)7
7
History and context
History and context
**US 571,604, 'Conveyer Belt Apparatus', Thomas Robins, Jr., granted 17 November 1896.**
Robins was working on the problem of moving coal and ore in bulk, where flat belts already existed and were disappointing. The patent's sheet 2 shows both halves of the answer: the three-roll troughing idler and the crowned pulley. Everything on a modern overland conveyor is an elaboration of those two figures.
The consequence was out of proportion to the mechanism. Bulk material had been moved by bucket elevator, by wagon and by hand; a troughed belt moved it continuously, at low power per tonne, over distances no other method could reach. The mines, the ports and eventually the quarries reorganised themselves around it.
**Honest limits.** A belt will not climb steeply — about eighteen to twenty degrees for loose aggregate before the load slides back, which is the material's own limit and not the belt's. It cannot turn a corner; it needs a transfer, and every transfer is a wear point, a dust point and a spillage point. It is a bad choice for anything very hot, very sharp or very sticky. And it is the single most dangerous machine on most sites, because it is quiet, it is long, it has nip points every few metres and it looks harmless.
材料
9- 1 bucket占位符
- 1 个占位符
- 3 个占位符
- 2 个占位符
- 12 个占位符
- 6 个占位符
- 2 个占位符
- 1 个占位符
- 1 bucket占位符
所需工具
17- 占位符
- 占位符
- 1 vendor sell this, none ship to you yet占位符
- 占位符
- 占位符
- 占位符
- 1 vendor sell this, none ship to you yet占位符
- 1 vendor sell this, none ship to you yet占位符
- 占位符
- 占位符
- 占位符
- 占位符
- 占位符
- 占位符
- 占位符
- 工业输送带电机10% 佣金占位符
相关蓝图
这些蓝图共享知识——技术、材料或原理
CC0 公共领域
此蓝图以 CC0 协议发布。你可以自由复制、修改、分发和使用此作品,无需征得许可。
通过购买蓝图中的产品支持创客,他们将获得 创客佣金 (由供应商设定),或创建此蓝图的新版本并将其作为连接包含在你自己的蓝图中以分享收入。



