Zusammenarbeit
KUNST
SCHÖNHEIT & WELLNESS
HANDWERK
KULTUR & GESCHICHTE
UNTERHALTUNG
UMFELD
ESSEN & GETRÄNKE
REVERSE ENGINEERING
WISSENSCHAFTEN
SPORT
TECHNOLOGIE
WEARABLES

DC Power Supply: SCR-Regulated, Voltage and Current Bridges with Automatic Cross-Over (Kupferberg & Ash, Forbro, US 3,305,763, 1967)
A variable DC supply regulated by controlled rectifiers instead of a series transistor. Two of the four rectifiers in the bridge are silicon controlled rectifiers; how late in each half-cycle they are fired sets the output. A voltage bridge and a current bridge each make an error signal, an analog OR gate passes whichever is larger, and the supply crosses over automatically between holding the voltage and holding the current.
Result: a variable voltage / current regulated DC supply with automatic cross-over.
Source: K. Kupferberg and J. Ash (Forbro Design), US 3,305,763 (1967), Fig. 1. Unknown: component values and the firing-angle circuit. Picture: the patent drawing.
Erfahren
Unknown
Anweisungen
1
1
Build the controlled rectifier bridge
Build the controlled rectifier bridge
In a case, wire the cord through a switch and fuse to a transformer. Feed its secondary into a bridge of two ordinary rectifiers and two silicon controlled rectifiers. Smooth the negative output through a choke and a capacitor, then through a current-sensing resistor (with a second capacitor forming a further filter) to the negative output terminal; the positive goes straight to the positive terminal. Ours: the case, switch and fuse. Not given: the ratings.
Materialien für diesen Schritt:
Aluminiumgehäuse1 Stück
Anschlussleitung mit Stecker1 Stück
Kippschalter1 Stück
Schmelzsicherung1 Stück
Abwärtstransformator1 Stück
Diode2 Stück
Thyristor (SCR)2 Stück
Siebdrossel1 Stück
Elektrolytkondensator2 Stück
Polklemme2 output + and -Benötigte Werkzeuge:
Handbohrer
Schraubendreher-Satz2
2
Build the two bridges
Build the two bridges
Current bridge: the sensing resistor, a reference Zener, a fixed resistor and the variable current-control resistor. Voltage bridge: the load across the output, the variable voltage-control resistor, a fixed resistor and a second reference Zener. Feed both Zeners from a small separate supply. Not given: the values, the Zener supply.
Materialien für diesen Schritt:
Z-Diode2 Stück
Regelwiderstand2 voltage and current controls
Widerstand1 sensing and bridge resistorsBenötigte Werkzeuge:
Lötkolben3
3
Build the control chain and use it
Build the control chain and use it
Invert the current bridge's error in a phase-reversing amplifier and feed it, with the voltage bridge's error, to an analog OR gate that passes the larger. Amplify the result and feed it to a firing-angle control circuit that fires the two controlled rectifiers' gates later or earlier in each half-cycle. In use, set the voltage and the current: for any load larger than the cross-over resistance (voltage setting divided by current setting) the supply holds the voltage, for a smaller one the current. Not given: the amplifier, OR-gate and firing circuits in this form.
Materialien für diesen Schritt:
Leiterplatte1 Stück
Transistorsortiment1 amplifiers
Unbekanntes Material1 OR gate and firing-angle circuit
Lötdraht1 as neededBenötigte Werkzeuge:
LötkolbenMaterialien
17- 1 StückPlatzhalter
- 1 StückPlatzhalter
- Platzhalter
- 1 StückPlatzhalter
- 1 StückPlatzhalter
- 2 StückPlatzhalter
- 2 StückPlatzhalter
- 1 StückPlatzhalter
- 2 StückPlatzhalter
- Platzhalter
- 2 StückPlatzhalter
- 2 voltage and current controlsPlatzhalter
- 1 sensing and bridge resistorsPlatzhalter
- 1 StückPlatzhalter
- 1 amplifiersPlatzhalter
- 1 OR gate and firing-angle circuitPlatzhalter
- 1 as neededPlatzhalter
Dieser Bauplan stellt her
Verwandte Blueprints
Diese Blueprints teilen Wissen — Techniken, Materialien oder Prinzipien
CC0 Gemeinfrei
Dieser Blueprint ist unter CC0 veröffentlicht. Sie dürfen dieses Werk für jeden Zweck frei kopieren, ändern, verbreiten und verwenden, ohne um Erlaubnis zu fragen.
Unterstützen Sie den Maker, indem Sie Produkte über seinen Blueprint kaufen, wo er eine Maker-Provision von Anbietern festgelegt, verdient. Oder erstellen Sie eine neue Iteration dieses Blueprints und verbinden Sie ihn in Ihrem eigenen Blueprint, um Einnahmen zu teilen.

