Iron Ball Mill: Grüson Drum with a Stepped Die Ring and Two Screens (Richards, 1903)
The Grüson ball mill: a drum turning on a horizontal axis, charged with chilled iron or steel balls of mixed sizes. The balls grind the ore against each other and against a stepped die ring. The ground ore passes out through a coarse and a fine screen; the oversize is carried back in.
Result: a mill for fine grinding of cement, fertiliser, clay and soft ores, wet or dry. Sizes from 0.66 m to 1.83 m across.
Source: R. H. Richards, Ore Dressing, vol. I (1903), § 225, Figs. 172a-b and Table 149. Unknown: dimensions beyond the table, and the materials of the side plates, screens and shaft. Picture: Richards, Figs. 172a-b.
උසස්
Unknown
උපදෙස්
1
1
Make the drum and the die ring
Make the drum and the die ring
The drum is two side plates (b) joined round the edge by the die ring (a). The die ring is five perforated, spiral plates of chilled iron. Each plate laps the next, so they form steps: the balls drop from one step to the next, and the space under each step lets the oversize from the screens back in. Not given: the side-plate material, sizes, hole sizes.
මෙම පියවර සඳහා ද්රව්ය:
වාත්තු යකඩ භාණ්ඩ5 die plates, chilled iron
නොදන්නා ද්රව්යය2 side platesඅවශ්ය මෙවලම්:
නොදන්නා මිනුම්
සීරුම් රැන්ච්2
2
Put the two screens round it
Put the two screens round it
Outside the die ring, fit a coarse perforated screen (c) to take the wear. It is in five parts with spaces between them and has back-deflecting holes (g). Outside that, fit a fine gauze screen (d). At the end of each section of fine screen, fix a deflector or shovel (f). As the drum turns, it carries the oversize up and back into the grinding space. Not given: the screens' metal and mesh.
මෙම පියවර සඳහා ද්රව්ය:
සිදුරු සහිත පෙරහන් තහඩුව1 coarse screen, 5 parts
වියන ලද කම්බි පෙරන රෙද්ද1 fine screen
නොදන්නා ද්රව්යය5 deflectorsඅවශ්ය මෙවලම්:
නොදන්නා මිනුම්
සීරුම් රැන්ච්3
3
Mount and house it
Mount and house it
Carry the drum on a horizontal shaft in two bearings; the figures show them on masonry piers. Enclose the drum in a plate iron housing with a discharge spout (e) below, a feed hopper (h) at one end, a manhole (i) and a dust pipe (k) on top. Ours: steel sheet for the plate iron.
මෙම පියවර සඳහා ද්රව්ය:
වානේ දණ්ඩ1 mill shaft
බෙයාරිං කුට්ටිය2 කැබලි
මෘදු වානේ තහඩුව1 housing, spout, hopperඅවශ්ය මෙවලම්:
සීරුම් රැන්ච්
නොදන්නා මිනුම්4
4
Fit the drive
Fit the drive
Drive the mill by gear and pinion. In the figure, the gear is on the mill shaft and the pinion on a countershaft that carries tight and loose pulleys. A belt from the line shaft runs on the pulleys: on the tight pulley the mill turns, on the loose pulley it stops.
මෙම පියවර සඳහා ද්රව්ය:
විශාල දැති රෝදය1 on the mill shaft
පිනියනය1 කැබැල්ල
වානේ දණ්ඩ1 countershaft
බෙයාරිං කුට්ටිය2 කැබලි
සවි කළ හා ලිහිල් කප්පි1 කැබැල්ලඅවශ්ය මෙවලම්:
ධාවන පටිය
සීරුම් රැන්ච්5
5
Charge the balls (size sets the charge)
Charge the balls (size sets the charge)
Load chilled iron or steel balls in mixed sizes; mixed sizes grind better than one size. Size is the variable: No. 0 (0.660 m drum, 45 rev/min) takes 15 kg of 40 mm and 45 kg of 80 mm balls, 60 kg in all. No. 2 (1.330 m, 30 rev/min) takes 100 kg each of 100, 115 and 125 mm, 300 kg. No. 4 (1.830 m, 25 rev/min) takes 217 kg each of the same three sizes, 650 kg. The bigger the drum, the slower it turns and the heavier its charge.
මෙම පියවර සඳහා ද්රව්ය:
ඇඹරුම් මාධ්ය (වානේ බෝල)300 kg for No. 2; 60 kg No. 0, 650 kg No. 4අවශ්ය මෙවලම්:
කාර්මික වේදිකා තරාදිය6
6
Grind
Grind
Feed the ore, egg-size, through the hopper and run the mill wet or dry. Power, and output per 24 hours: No. 0 takes 1/4 horse power and grinds 1,680 kg of copper ore to 15 mesh, or 840 kg of chrome iron ore to 130 mesh. No. 2 takes 2 1/2 to 3 horse power: 14,400 kg of brick bats to 20 mesh, or 1,920 kg of emery to 200 mesh. No. 4 takes 9 to 11 horse power: 12,720 kg of gold ores to 40 mesh, or 10,800 kg of chrome iron ore to 130 mesh. Wear: 1,345 kg of balls for 102,400 barrels of cement, about 0.139 lb a ton. The end plates last 18 months. Hard quartz ores wear the balls too much.
අවශ්ය මෙවලම්:
ධාවන පටිය
ජලයද්රව්ය
11- 5 die plates, chilled ironස්ථානගත
- 5 deflectorsස්ථානගත
- 1 coarse screen, 5 partsස්ථානගත
- 1 fine screenස්ථානගත
- 1 countershaftස්ථානගත
- 2 කැබලිස්ථානගත
- 1 housing, spout, hopperස්ථානගත
- 1 on the mill shaftස්ථානගත
- 1 කැබැල්ලස්ථානගත
- 1 කැබැල්ලස්ථානගත
- 300 kg for No. 2; 60 kg No. 0, 650 kg No. 4ස්ථානගත
සම්බන්ධිත සැලසුම්වල ද්රව්ය
මෙම සැලසුම සාදන්නේ
සම්බන්ධ බ්ලූප්රින්ට්
මෙම බ්ලූප්රින්ට් දැනුම බෙදා ගනී — ශිල්ප ක්රම, ද්රව්ය හෝ මූලධර්ම
CC0 පොදු වසම
මෙම බ්ලූප්රින්ට් CC0 යටතේ නිකුත් කර ඇත. ඔබට අවසර නොමැතිව පිටපත් කිරීම, වෙනස් කිරීම, බෙදා හැරීම සහ භාවිතා කිරීම කළ හැක.
බ්ලූප්රින්ට් හරහා නිෂ්පාදන මිලදී ගැනීමෙන් නිර්මාතෘට සහාය වන්න නිර්මාතෘ කොමිසම විකුණුම්කරුවන් විසින් නියම කළ, හෝ මෙම බ්ලූප්රින්ට්හි නව අනුවාදයක් සාදා ආදායම බෙදා ගැනීමට ඔබේ බ්ලූප්රින්ට්හි සම්බන්ධතාවයක් ලෙස ඇතුළත් කරන්න.