İşbirliği
SANAT
GÜZELLİK & SAĞLIK
ZANAAT
KÜLTÜR & TARİH
EĞLENCE
ÇEVRE
YİYECEK & İÇECEK
TERS MÜHENDİSLİK
BİLİMLER
SPOR
TEKNOLOJİ
GİYİLEBİLİR ÜRÜNLER
Woodsman's Log Raft: Logs Pinned to Notched Cross Poles With Wooden Spikes, Built With a Hand Ax (Boy Mechanic, 1919)
Woody

Oluşturan

Woody

13. Kasım 2026NO
6
0
0
0
0

Woodsman's Log Raft: Logs Pinned to Notched Cross Poles With Wooden Spikes, Built With a Hand Ax (Boy Mechanic, 1919)

A. M. Parker's woodsman's raft from The Boy Mechanic, Book 3 (1919), for crossing a stream with only a hand ax: logs rolled into the shallows, cross poles notched into them and held by pairs of hardwood pins driven diagonally so they clamp the poles. For one passenger he uses three logs 9 to 12 in thick and 12 to 16 ft long, spaced to 5 ft.
Orta
About half a day

Talimatlar

1

His sizes, and a rough buoyancy check

Jupyter defteri yükleniyor…
2

Read The Boy Mechanic, Book 3

The woodsman "has only a hand ax as his tool equipment"; the raft is "pinned together firmly with poles and pointed wooden spikes, cut on the spot". Dry logs are better than wet or green ones; green logs need a larger raft for the same load.
3

Cut logs, poles and pins

On a shore sloping gently into the water, cut the logs and roll them to the bank, alternating the butts. For one passenger: three logs 9 to 12 in thick, 12 to 16 ft long, to be spaced 5 ft wide (for heavier loads, more logs set closer). Cut poles about 3 in thick, long enough to cross the raft, and a number of hardwood pins 1 ft long, sharpened at one end.

Bu adım için malzemeler:

TomrukTomruk3 adet
Ahşap sırıkAhşap sırık4 adet
Sert Ağaç TahtasıSert Ağaç Tahtası1 adet

Gerekli aletler:

BaltaBalta
El baltasıEl baltası
4

Notch and pin the first log

Roll the first, one of the largest, into the water until it nearly floats, any bow or hump toward the outer edge. Chop notches 2 in deep in its top about 1-1/2 ft from the ends, squarely across. Lay a pole in a notch, its end just past the log, and cut a double notch in the pole's upper edge so the pins rest diagonally in it. Split rifts in the log with the ax, cutting as if to split off a slab, not toward the centre, and drive two pins in crossed over the pole. Fasten a second pole at the other end.

Gerekli aletler:

El baltasıEl baltası
ÇekiçÇekiç
5

Add the other logs

Prop up both poles, roll the next log in underneath and notch it before slipping it into place. Only alternate ends of the inner logs need pinning; some can be left loose if held tight between pinned ones. Push the raft out as each log is added; in a strong current, guy it to the bank downstream with a pole. Float the last log, a large one, down and pin it at both ends. Cover with light poles or brush for dry footing.

Bu adım için malzemeler:

Ahşap sırıkAhşap sırık6 adet

Gerekli aletler:

El baltasıEl baltası
6

Troubleshooting

Log raft troubleshooting.

Flow

Loading...
7

History and honest limits

From "A Woodsman's Log Raft" by A. M. Parker, in **The Boy Mechanic, Book 3**, Popular Mechanics, 1919 (Project Gutenberg 71856; checked on the archive.org scan boymechanic0003unse, pp. 185-186). The buoyancy figures in the notebook are an example of ours, not his. The metric figures are ours.

Malzemeler

3

Gerekli Aletler

3

İlgili Blueprint'ler

Bu blueprint'ler bilgi paylaşır — teknikler, malzemeler veya ilkeler

CC0 Kamu Malı

Bu plan CC0 lisansıyla yayınlanmıştır. İzin almadan kopyalayabilir, değiştirebilir, dağıtabilir ve herhangi bir amaçla kullanabilirsiniz.

Planı üzerinden ürün satın alarak Maker'ı destekleyin, böylece Maker Komisyonu Satıcılar tarafından belirlenen komisyonu kazanırlar veya bu Planın yeni bir versiyonunu oluşturun ve gelir paylaşımı için kendi Planınıza bağlantı olarak ekleyin.

Tartışma

(0)

Giriş yapın tartışmaya katılmak için

Yorumlar yükleniyor...