Canoe Sailing Rig: Bamboo Mast, 9 ft Lateen Sail, Clamp-In Mast Thwart and Leeboards (Boy Mechanic, 1919)
Woody

Oluşturan

Woody

13. Kasım 2026NO
11
0
0
0
0

Canoe Sailing Rig: Bamboo Mast, 9 ft Lateen Sail, Clamp-In Mast Thwart and Leeboards (Boy Mechanic, 1919)

Stillman Taylor's sailing outfit for a 16 ft open canoe from The Boy Mechanic, Book 3 (1919): a 6 ft 10 in bamboo mast, a 9 ft lateen sail of cotton sheeting on two bamboo spars, a mast thwart and leeboard thwart that clamp to the gunwales with brass lantern-board hooks, and leeboards set by thumb nuts. Steer with the paddle.
Orta
A few days

Talimatlar

1

Rig sizes and sail area

Jupyter defteri yükleniyor…
2

Read The Boy Mechanic, Book 3

"The lateen rig is best for an open canoe, because a shorter mast is required for the same sail area ... It is not safe to rig a canoe too heavily, and the rig described has been found to be well proportioned."
3

Make the mast

Cut bamboo 1-1/2 in across to 6 ft 10 in (carpet dealers' rolling bamboo of 1-1/2 to 2 in serves). Whittle a tapered wooden plug about 3 in long to wedge firmly in the top without splitting the cane, bore a small hole through the cane 2 in from the top, and fix a screw eye into the plug for the halyard. Drive small brads through the cane into the plug, and fit a brass ferrule over the end.

Bu adım için malzemeler:

Bambu sırıklarBambu sırıklar1 adet
Sert Ağaç TahtasıSert Ağaç Tahtası1 adet
Halkalı vidaHalkalı vida1 adet
ÇivilerÇiviler1 adet
Metal halkaMetal halka1 adet

Gerekli aletler:

El TesteresiEl Testeresi
Deri bıçağıDeri bıçağı
El matkabıEl matkabı
ÇekiçÇekiç
4

Make the spars

Use two bamboo fishing rods, 1 in at the butt and 10 ft long, as gaff and boom. Fix a 1-1/2 in screw eye with a 1/2 in eye at the end of each and join the spar ends with a 1-1/2 in brass split ring and a 1-3/4 in brass S hook. Fasten the 2 in brass boom jaw on the boom with its open end 18 in from the boom's forward end.

Bu adım için malzemeler:

Bambu çubukBambu çubuk2 adet
Halkalı vidaHalkalı vida2 adet
Çift sarımlı anahtar halkasıÇift sarımlı anahtar halkası1 adet
S kancaS kanca1 adet
Bumba çatalıBumba çatalı1 adet
Ahşap vidalarAhşap vidalar1 adet

Gerekli aletler:

El matkabıEl matkabı
Düz tornavidaDüz tornavida
Şerit MetreŞerit Metre
5

Sew the sail

Lay the spars on the cloth and pencil a triangle 9 ft on each side. Sew the widths of 1 yd unbleached cotton sheeting together, lapped about 1/2 in and stitched close to both edges, preferably on a machine. Sew bights (folds) 1/2 in wide, 6 in apart, parallel with the leech. Reinforce the corners with segments of cloth. Along the edges lashed to the spars fold and sew 1 in hems, running a 1/2 in tape into the leech hem; fasten the tape to the spar at each end to take up stretch and stop a flapping leech.

Bu adım için malzemeler:

Pamuklu BezPamuklu Bez8 yard
Dikiş ipliğiDikiş ipliği1 adet
Pamuklu şerit bantPamuklu şerit bant1 adet

Gerekli aletler:

Dikiş makinesiDikiş makinesi
MakasMakas
Kurşun kalemKurşun kalem
Şerit MetreŞerit Metre
6

Make the thwarts and mast step

Mast thwart: two cedar or pine boards 28 by 10 by 3/8 in and a piece 27-1/2 by 3-1/2 by 3/4 in, made as in the plate with a hole in the centre for the mast and a brass lantern-board hook at each end to clamp it to the gunwales. Mast step: a block 5 by 2-1/2 by 1 in, shaped neatly, fixed to the grating (or the ribs). Leeboard thwart: cedar or white pine 5 ft by 4 by 7/8 in, with short upright ends set at an angle to the canoe's curve so it wedges in just aft of the mast; groove the ends to the thwart and screw them on. He gives no leeboard sizes; bolt a leeboard to each end with a 3 in by 5/16 in brass bolt, washer and thumb nut so its angle can be set.

Bu adım için malzemeler:

Sedir tahtasıSedir tahtası4 adet
Fener tahtası kancasıFener tahtası kancası4 adet
Soba cıvatasıSoba cıvatası2 adet
Düz PulDüz Pul2 adet
Kanatlı somunKanatlı somun2 adet
Ahşap vidalarAhşap vidalar1 adet

Gerekli aletler:

El TesteresiEl Testeresi
Kıl TestereKıl Testere
El rendesiEl rendesi
Marangoz keskileriMarangoz keskileri
Kol matkabı ve ucuKol matkabı ve ucu
Düz tornavidaDüz tornavida
7

Finish and rig

Smooth all woodwork with sharp tools, sandpaper lightly, and give three coats of spar varnish. Lash the sail to the spars, run the 1/4 in cotton-rope halyard through the screw eye at the masthead until the gaff is close to the top, and find the balance by tying the halyard at different points along the gaff. Run the halyard under the forward thwart to the stern, never tied to it, and loop the main sheet round a thwart and hold it, never made fast.

Bu adım için malzemeler:

Zımpara KağıdıZımpara Kağıdı1 adet
Seren verniğiSeren verniği1 adet
Pamuk halatPamuk halat1 adet

Gerekli aletler:

Geniş boya fırçasıGeniş boya fırçası
MakasMakas
8

Sailing safely

Canoe sailing.

Flow

Loading...
9

History and honest limits

From "How to Build a Canoe, Part II" by Stillman Taylor, in **The Boy Mechanic, Book 3**, Popular Mechanics, 1919 (Project Gutenberg 71856; checked on the archive.org scan boymechanic0003unse, pp. 86-88). He gives no leeboard sizes (they vary with the canoe); the list calls the leeboard bolts brass stove bolts with thumb nuts and the text carriage bolts with wing nuts. Cedar for the leeboards, the sail area and the metric figures are ours.

Malzemeler

21

Gerekli Aletler

14

CC0 Kamu Malı

Bu plan CC0 lisansıyla yayınlanmıştır. İzin almadan kopyalayabilir, değiştirebilir, dağıtabilir ve herhangi bir amaçla kullanabilirsiniz.

Planı üzerinden ürün satın alarak Maker'ı destekleyin, böylece Maker Komisyonu Satıcılar tarafından belirlenen komisyonu kazanırlar veya bu Planın yeni bir versiyonunu oluşturun ve gelir paylaşımı için kendi Planınıza bağlantı olarak ekleyin.

Tartışma

(0)

Giriş yapın tartışmaya katılmak için

Yorumlar yükleniyor...