NGHỆ THUẬT
LÀM ĐẸP VÀ SỨC KHỎE
THỦ CÔNG
VĂN HÓA VÀ LỊCH SỬ
GIẢI TRÍ
MÔI TRƯỜNG
THỰC PHẨM VÀ ĐỒ UỐNG
KỸ THUẬT NGƯỢC
KHOA HỌC
THỂ THAO
CÔNG NGHỆ
THIẾT BỊ ĐEO
Fume Hood (Ducted): Sloping Stone Baffle Set from Outside by a Crank (Liptay, US 2,779,265, 1957)
Penny

Tạo bởi

Penny

3. tháng Mười Một 2026DK
0
0
0
0
0

Fume Hood (Ducted): Sloping Stone Baffle Set from Outside by a Crank (Liptay, US 2,779,265, 1957)

A bench fume hood on a stone counter, drawn off through a duct with a fan. Inside, a sloping stone baffle leaves a gap at the top and one at the bottom. A crank under the counter slides the baffle: one gap grows as the other shrinks, so the air sweeps light fumes out at the top or heavy fumes out at the bottom, with no one reaching inside. Result: a ducted hood whose air flow can be set for light or heavy fumes during work. Source: J. M. Liptay, US 2,779,265 (1957). Unknown: sizes, air flow, the fan and most materials. Picture: the patent drawing.
Nâng cao
Unknown

Hướng dẫn

1

Build the cabinet and stone counter

Build a sheet metal cabinet. Fix spaced sheet metal channels to its front panel and rear wall, and lay a stone slab on them as the counter. Bore a hole through the slab near the back, at the middle, for the baffle's lifting rod. Not given: sizes, the metal.

Vật liệu cho bước này:

Kim loại chưa rõKim loại chưa rõ1 cabinet and channels
Phiến đá phẳngPhiến đá phẳng1 counter

Công cụ cần thiết:

Kéo cắt tônKéo cắt tôn
Máy khoan bànMáy khoan bàn
Kích thước chưa rõKích thước chưa rõ
2

Build the hood

On the counter, make a frame of corner angle irons. Fix to it two sides, a rear wall, a roof and a front panel. Leave the front open below the front panel: this is the large opening where you work and where air comes in. Cut the fume outlet in the roof, towards the back. Not given: the panel material, sizes.

Vật liệu cho bước này:

Thép góc cán nóngThép góc cán nóng1 corner frame
Vật liệu không rõVật liệu không rõ1 sides, rear wall, roof, front panel

Công cụ cần thiết:

Cưa sắtCưa sắt
Kích thước chưa rõKích thước chưa rõ
3

Fit the exhaust pipe and fan

Fix an exhaust pipe over the roof outlet, with a fan in it, to draw the fumes out. Not given: the pipe, the fan, the air flow.

Vật liệu cho bước này:

Đường ống dẫn khíĐường ống dẫn khí1 exhaust pipe
Máy thổi khíMáy thổi khí1 fan

Công cụ cần thiết:

Mỏ lếtMỏ lết
4

Fit the sloping baffle

Make a solid stone baffle almost as wide as the hood. Set it sloping up and forward from the rear wall, so it splits the inside into the work space in front and a duct behind that widens upward to the outlet. Guide it on sloping rails in front and strips behind, fixed to the sides, so it can slide. Leave a gap between its top and the roof, and one between its bottom and the counter. Not given: the rails' metal, sizes.

Vật liệu cho bước này:

Phiến đá phẳngPhiến đá phẳng1 baffle
Kim loại chưa rõKim loại chưa rõ1 rails and strips

Công cụ cần thiết:

Kích thước chưa rõKích thước chưa rõ
5

Make the lifting rod

Cut a notch in the middle of the baffle's lower edge. Make a V-shaped yoke whose legs straddle the baffle front and back, rivet the legs to it, and give the yoke a rod that hangs down through the hole in the counter. Thread the rod's lower end. Not given: the metal.

Vật liệu cho bước này:

Kim loại chưa rõKim loại chưa rõ1 yoke, rod, rivets

Công cụ cần thiết:

Bộ tán rivêBộ tán rivê
Bộ ta-rô và bàn renBộ ta-rô và bàn ren
6

Fit the bell crank

Under the counter, pivot a bell crank lever on a bolt through the lugs of a bracket fixed to the cabinet's rear channel. Screw a coupling onto the rod's threaded end. The coupling's two curved lips rock on the lever's long arm, and its tongue hangs through a slot in the arm, held by a cotter pin. On the short arm, a yoke turns on two bolts set fast in the threaded cross-holes of a round nut. Ours: hex bolts and nuts.

Vật liệu cho bước này:

Đòn bẩy vuông gócĐòn bẩy vuông góc1 bell crank
Kim loại chưa rõKim loại chưa rõ1 bracket, coupling, round nut
Bộ bu lông lục giác nhiều cỡBộ bu lông lục giác nhiều cỡ3 cái
Đai ốc lục giácĐai ốc lục giác1 cái
Chốt chẻChốt chẻ1 cái

Công cụ cần thiết:

Bộ ta-rô và bàn renBộ ta-rô và bàn ren
Mỏ lếtMỏ lết
7

Fit the crank and set the baffle

Screw a metal operating rod through the round nut and run it forward to the cabinet front. Screw its front socket onto the shaft of a hand crank and pin it with a cotter pin. Weld an angle iron to the inside of the front panel to stiffen it. Clamp a bushing through the panel with a nut, and set a ball bearing between two rings on the shaft, between the bushing and the crank. Turning the crank tips the bell crank, which raises the rod and baffle or lets them slide down by their own weight: as one gap grows the other shrinks. Air comes in at the front; the upper stream carries light fumes to the top gap, the lower stream heavy fumes to the bottom gap. Open the top fully for light fumes, the bottom fully for heavy ones, or set any point between, without reaching inside. A sliding safety sash may be fitted over the front opening, to watch dangerous reactions safely.

Vật liệu cho bước này:

Kim loại chưa rõKim loại chưa rõ1 operating rod, crank, bushing
Chốt chẻChốt chẻ1 cái
Đai ốc lục giácĐai ốc lục giác1 cái
Thép góc cán nóngThép góc cán nóng1 stiffener
Ổ bi chặnỔ bi chặn1 cái

Công cụ cần thiết:

Máy hàn hồ quangMáy hàn hồ quang
Bộ ta-rô và bàn renBộ ta-rô và bàn ren
Mỏ lếtMỏ lết

Vật liệu

11

Công cụ yêu cầu

8

Blueprint liên quan

Các blueprint này chia sẻ kiến thức — kỹ thuật, vật liệu hoặc nguyên tắc

CC0 Phạm vi công cộng

Bản thiết kế này được phát hành theo CC0. Bạn tự do sao chép, sửa đổi, phân phối và sử dụng cho bất kỳ mục đích nào mà không cần xin phép.

Hỗ trợ nhà sáng tạo bằng cách mua sản phẩm qua bản thiết kế, nơi họ nhận Hoa hồng nhà sáng tạo do nhà bán hàng đặt, hoặc tạo phiên bản mới và kết nối trong bản thiết kế riêng để chia sẻ doanh thu.

Thảo luận

(0)

Đăng nhập để tham gia thảo luận

Đang tải bình luận...