Rocking Bucket-Dasher Churn: A Crank and Rod Rock a Dasher of Bucketed Arms, a Fixed Bucket Breaks the Current
Buttercup

Autor

Buttercup

11. listopad 2026IE
8
0
0
0
0

Rocking Bucket-Dasher Churn: A Crank and Rod Rock a Dasher of Bucketed Arms, a Fixed Bucket Breaks the Current

Gillett Bunting of Liberty, Indiana, received US 26,226, dated 22 November 1859, for a churn-dasher. A dasher of crossed arms with buckets on their ends rocks on a level shaft whose bearings slide up or down to suit the amount of cream. A crank above, turned through a pair of cog wheels with a balance wheel, rocks it by a long rod, throwing the cream into opposing currents, and a fixed bucket on the bottom breaks the current along the floor. The patent gives no sizes; every size here is ours.
Średniozaawansowany
About 2 days, plus printing

Instrukcje

1

How far the dasher rocks

Wczytywanie notatnika Jupyter…
2

Agitators swung on pivots, two weeks before

Cooper swings his agitators from a dash rod worked by hand. Bunting rocks a whole dasher from a crank.
3

Read US 26,226

"the rapid oscillating motion thus imparted to the dasher, through the medium of buckets (e' g', K) forces the cream into violent opposing currents, at the same time, the concussive action of the buckets (e', g') and arms (e, g) and bar (E) upon the cream is fully developed, thereby producing, a rapid and violent agitation of the cream"
4

Print the driving wheel G

Spur wheel, 48 teeth, module 3, 15 mm face, with a hub bored 20.6 mm. PETG, 0.2 mm layers, 40 % infill, 4 walls.
Plik projektowySTLCC0 - Free
5

Print the wheel h

Spur pinion, 16 teeth, module 3, 15 mm face, with a hub bored 12.6 mm and a cross hole for a pin. PETG, 0.2 mm layers, 40 % infill, 4 walls.
Plik projektowySTLCC0 - Free
6

Shell A, bed A', guides L and bucket K

Use a wooden tub 360 mm across inside at the floor, 320 mm at the top and 420 mm deep. Stand it on a bed board 520 x 560 mm between two guide strips. Glue and screw a hardwood block K, 60 x 300 x 60 mm, across the middle of the floor, with a 24 x 24 mm socket 50 mm deep near each end for the slides. Fill the tub with water overnight so it swells tight, then empty it.

Materiały do tego kroku:

Drewniana baliaDrewniana balia1 sztuka
Deska z drewna liściastegoDeska z drewna liściastego2 sztuk
Klej do drewnaKlej do drewna1 sztuka
Wkręty do drewnaWkręty do drewna12 sztuk

Potrzebne narzędzia:

Pilarka stołowaPilarka stołowa
Piła ręcznaPiła ręczna
Dłuto do gniazdDłuto do gniazd
Pobijak drewnianyPobijak drewniany
Wiertarko-wkrętarka akumulatorowaWiertarko-wkrętarka akumulatorowa
Zestaw wiertełZestaw wierteł
Ścisk stolarski listwowyŚcisk stolarski listwowy
Miara zwijanaMiara zwijana
WodaWoda
7

Slides f and the dasher

Cut two slides 20 x 24 mm, 255 mm long, bore each 21 mm 225 mm from its foot for the shaft's journal, and a row of 6 mm holes near the foot for a set screw through the block K. Make the shaft F a 20 mm hardwood dowel 280 mm long. Mortise through it two arms e 20 x 30 mm, 210 mm long, 150 mm apart, two arms g 20 x 30 mm, 260 mm long, at right angles to them, 80 mm apart, and the bar E 20 x 30 mm, 235 mm long, between the arms e, its long end reaching 100 mm past the shaft and bored 12.6 mm. Screw three U-channel buckets 170 x 40 x 20 mm of hardwood across the ends: one on the arms e and E's short end, one on each end of the arms g. Stand the slides in K with the shaft's ends in them, 240 mm up.

Materiały do tego kroku:

Deska z drewna liściastegoDeska z drewna liściastego2 sztuk
Kołki z twardego drewnaKołki z twardego drewna1 sztuka
Klej do drewnaKlej do drewna1 sztuka
Wkręty do drewnaWkręty do drewna24 sztuk
Zestaw śrub sześciokątnychZestaw śrub sześciokątnych2 sztuk

Potrzebne narzędzia:

Pilarka stołowaPilarka stołowa
Frezarka górnowrzecionowaFrezarka górnowrzecionowa
Dłuto do gniazdDłuto do gniazd
Pobijak drewnianyPobijak drewniany
Wiertarko-wkrętarka akumulatorowaWiertarko-wkrętarka akumulatorowa
Zestaw wiertełZestaw wierteł
Papier ściernyPapier ścierny
Miara zwijanaMiara zwijana
8

Frame B, crank shaft C, wheels and rod D

Bolt two posts of 40 x 30 mm hardwood to the bed beside the tub, 400 mm apart, 850 mm tall, and bore them 12.6 mm 690 mm above the tub's floor. Bend a 12 mm stainless shaft C into a crank of 50 mm throw in its middle, heating the bends red with the torch, and run it through the posts over the bar E's end. Pin the wheel h on one end and a hardwood balance wheel k, 260 mm across and 30 mm thick, on the other. Fix a 20 mm stud above h for the wheel G, meshing, with a crank handle H. Join the crank to E's end with a hardwood rod D, 450 mm between its pins.

Materiały do tego kroku:

Drewno iglaste 70x70 mmDrewno iglaste 70x70 mm1 sztuka
Deska z drewna liściastegoDeska z drewna liściastego2 sztuk
Pręt ze stali nierdzewnejPręt ze stali nierdzewnej2 sztuk
Shaft CollarShaft Collar2 sztuk
ZawleczkaZawleczka4 sztuk
Podkładka płaskaPodkładka płaska6 sztuk
Zestaw śrub sześciokątnychZestaw śrub sześciokątnych4 sztuk
Nakrętka samohamowna z wkładką nylonowąNakrętka samohamowna z wkładką nylonową4 sztuk
Filament PETGFilament PETG1 sztuka

Potrzebne narzędzia:

Drukarka 3D z filamentem (FDM)Drukarka 3D z filamentem (FDM)
Palnik propanowyPalnik propanowy
Imadło warsztatoweImadło warsztatowe
MłotekMłotek
Rękawice żaroodporneRękawice żaroodporne
WyrzynarkaWyrzynarka
KompasKompas
Piła do metaluPiła do metalu
Pilniki (pilnik ręczny)Pilniki (pilnik ręczny)
Wiertarko-wkrętarka akumulatorowaWiertarko-wkrętarka akumulatorowa
Zestaw wiertełZestaw wierteł
Klucz nastawnyKlucz nastawny
9

The build in 3D

FreeCAD model of this build, the tub cut through the middle: the bed and guides, the fixed bucket K with the two slides, the dasher with its arms, bar E and three buckets, the rod D up to the cranked shaft C, the wheels G and h, the crank H and the balance wheel. The crank was turned through 24 positions.
Plik projektowyBLENDCC0 - Free
10

Churn

Pour in heavy cream at about 15 °C, checked with the thermometer; for less cream, lower the slides in K so the dasher still works in it. Turn the crank H steadily, timing it. When the butter comes, lift the rod off the crank and the dasher out on its slides, take out the butter, drain the buttermilk, wash the butter in cold water until it runs clear, salt and weigh it.

Materiały do tego kroku:

Śmietanka kremówkaŚmietanka kremówka15 l
Sól morska gruboziarnistaSól morska gruboziarnista1 sztuka
WodaWoda1 sztuka

Potrzebne narzędzia:

Termometr z sondą pozostawianą w potrawieTermometr z sondą pozostawianą w potrawie
StoperStoper
Cyfrowa waga kuchennaCyfrowa waga kuchenna
Duża misa ze stali nierdzewnejDuża misa ze stali nierdzewnej
11

Troubleshooting

Rocking dasher troubleshooting.

Flow

Loading...
12

History and honest limits

**Gillett Bunting** of Liberty, Union County, Indiana, assignor to himself and W. M. Jarrell, US 26,226, 22 November 1859, "Churn-Dasher". He disclaimed hinged churn-dashers and oscillating movement as such, and claimed the vibrating movement of the dasher by the arms with the crank, driving wheel and connecting rod, with the current breaker K. The patent gives no sizes; every size here is ours. His frame B stands on the shell's top; ours is two posts on the bed beside it.

Materiały

16

Wymagane narzędzia

25

Pliki projektowe

3

CC0 Domena publiczna

Ten plan jest udostępniany na licencji CC0. Możesz go swobodnie kopiować, modyfikować, rozpowszechniać i wykorzystywać do dowolnych celów, bez konieczności uzyskiwania zgody.

Wesprzyj Makera kupując produkty przez jego plan, za co zarabia Prowizja Makera ustalony przez sprzedawców, lub stwórz nową iterację tego planu i dołącz go jako połączenie w swoim własnym planie, aby dzielić się przychodami.

Dyskusja

(0)

Zaloguj się aby dołączyć do dyskusji

Ładowanie komentarzy...